On-site work time: Difference between revisions
From Electrical Installation Guide
m (cleaned up source: table format, etc ...) |
m (1 revision) |
Revision as of 20:13, 10 December 2013
Time for implementing the electrical equipment on the site.
Different levels of priority
- Secondary: the on-site work time can be extended, if this gives a reduction in overall installation costs,
- Special: the on-site work time must be minimized, without generating any significant excess cost,
- Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,