On-site work time: Difference between revisions

From Electrical Installation Guide
(Text modified (guide 2015))
(page redirected as per guide 2016)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{Menu_MV_and_LV_architecture_selection_guide}}
  #REDIRECT [[Architecture_assessment_criteria]]
<br>
Time for implementing the electrical equipment on the site.
 
===== Different levels of priority =====
 
* Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs,
* Special: the on-site work time must be minimized, without generating any significant excess cost,
* Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,
 
[[ru:Длительность монтажа]]
[[zh:现场工作时间]]

Latest revision as of 01:39, 18 July 2016

Share