Choice of architecture fundamentals: Difference between revisions

From Electrical Installation Guide
Home > MV and LV architecture selection guide for buildings > Choice of architecture fundamentals
(Cleanup_2016)
(converted syntax for Manual Tocs)
Line 10: Line 10:
* The second stage deals with the principle of supply of the LV consumers  
* The second stage deals with the principle of supply of the LV consumers  


{{Manual_TOC |
{{Section-TOC}}
* [[Connection to the utility network]]
* [[Internal MV circuits]]
* [[Number and localisation of MV/LV transformer substations]]
* [[Number of MV/LV transformers]]
* [[MV back-up generator]]
}}


[[ru:Выбор основных элементов архитектуры]]
[[ru:Выбор основных элементов архитектуры]]
[[zh:系统基本条件的选择]]
[[zh:系统基本条件的选择]]

Revision as of 13:59, 20 December 2019


For the installations considered in this guide, the selection of an electrical architecture can be performed in two stages.

  • The first stage is generally dedicated to:
    • The selection of the mode of connection of the installation to the utility network,
    • The choice of the internal MV distribution including:
      • The definition of the number of MV/LV substations,
      • The definition of the number of MV/LV transformers,
      • The definition of the MV back-up generator when needed.
  • The second stage deals with the principle of supply of the LV consumers