MV back-up generator: Difference between revisions
From Electrical Installation Guide
Migrate2019 (talk | contribs) (removed empty lines at the beginning of wiki pages) |
m (1 revision imported: Migrated pages - Remove empty lines begin pages) |
(No difference)
|
Revision as of 17:33, 20 December 2019
MV back-up generators are required when in case of the utility failure it is necessary to ensure the supply of the totality of the loads or the major part of them.
For all the other situations LV back generators may be enough
The main criteria to consider for the implementation of MV back-up generators are the following:
- Site activity
- Sensitivity of the loads to power interruptions
- Level of availability of the public distribution network
- Process including a co-generation system
- Need to optimize the energy bill.