Number of MV/LV transformers: Difference between revisions

From Electrical Installation Guide
(Text modified (guide 2015))
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "")
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Menu_MV_and_LV_architecture_selection_guide}}
{{Menu_MV_and_LV_architecture_selection_guide}}
For every MV/LV substation, the definition of the number of MV/LV transformers takes into account the following criteria:
For every MV/LV substation, the definition of the number of MV/LV transformers takes into account the following criteria:
* Total power supplied by the substation
* Total power supplied by the substation
* Standardization of the rated power to reduce the number of spare transformers
* Standardization of the rated power to reduce the number of spare transformers
Line 11: Line 9:
* Need for partial or total redundancy. When required, two transformers each sized for the full load and equipped with an automatic change-over are installed
* Need for partial or total redundancy. When required, two transformers each sized for the full load and equipped with an automatic change-over are installed
* Loads requiring a dedicated neutral system. IT for example to ensure the continuity of operation in case of phase to earth fault
* Loads requiring a dedicated neutral system. IT for example to ensure the continuity of operation in case of phase to earth fault
[[ru:Число трансформаторов высокого/низкого напряжения]]
[[zh:中压/低压变压器的数量]]

Latest revision as of 09:49, 22 June 2022

For every MV/LV substation, the definition of the number of MV/LV transformers takes into account the following criteria:

  • Total power supplied by the substation
  • Standardization of the rated power to reduce the number of spare transformers
  • Limit of the rated power. It is recommended to set this limit at 1250 kVA in order to facilitate the handling and the replacement of the transformers
  • Scalability of the installation
  • Need to separate the loads having a high level of sensitivity to the electrical perturbations
  • Need to dedicate a transformer to the load generating a high level of perturbation such as voltage dips, harmonics, flicker
  • Need for partial or total redundancy. When required, two transformers each sized for the full load and equipped with an automatic change-over are installed
  • Loads requiring a dedicated neutral system. IT for example to ensure the continuity of operation in case of phase to earth fault
Share