Sizing and protection of conductors: Difference between revisions

From Electrical Installation Guide
Home > Sizing and protection of conductors
(updated link)
m (1 revision imported: move to MW1.39)
 
(10 intermediate revisions by 3 users not shown)
Line 1: Line 1:
__NOTOC__ __NOEDITSECTION__{{Menu_Sizing_and_protection_of_conductors}}
<!-------------------------------------------------------------------------------------------------------------------------
=== [[Conductor sizing and protection]] ===
----            define HERE the LETTER of this chapter (A...S). It is then used in different places further below, in this page
-------------------------v-------------------------------------------------------------------------------------------------
---->{{#vardefine:letter|G}}<!--


[[Conductor sizing: methodology and definition|Methodology and definition]]


[[Overcurrent protection principles|Overcurrent protection principles]]
--><div class="chapter-banner">[[File:Banner-chapter_{{#var:letter}}.jpg|class=chapter-banner-img|link=]]</div>
{{Highlightbox|text=
<!-----------------------------------------------------------------------------------------------------------------------------
---- Description text for this chapter - START
------------------------------------------------------------------------------------------------------------------------------>
Selection of cross-sectional-areas of cables is certainly one of the most important tasks of the design process of an electrical installation as this greatly influences:
* the selection of overcurrent protective devices,
* the voltage drop along these conductors
* and the estimation of the prospective short-circuit currents
This chapters details the different steps and methodologies for conductor sizing. And the specific recommendations for neutral and Protective Earth (PE) conductors sizing.
<!-----------------------------------------------------------------------------------------------------------------------------
---- Description text for this chapter - END
------------------------------------------------------------------------------------------------------------------------------>
}}
<!--


[[Practical values for a protective scheme|Practical values for a protective scheme]]


[[Location of protective devices|Location of protective devices]]
--><!-----------------------------------------------------------------------------------
---add chapter TOC, based on Hierarchy (DO NOT MODIFY!)
----------------------------------------------------------------------------------------
-->{{ch-toc|letter={{#var:letter}}}}


[[Conductors in parallel|Conductors in parallel]]
<!-- -----------------------------------------------------------------------------------
---- define all properties and categories for this chapter landing page (DO NOT MODIFY!)
----------------------------------------------------------------------------------------
-->__NOTOC__ __NOEDITSECTION__<!--
-->[[Has chapter letter::{{#var:letter}}| ]]<!--
-->{{#isin:{{MediaWiki:mainpage}}}}<!--
-->[[Category:eig-ch-landing-pages]]<!--
-->{{ch-category|{{#var:letter}}}}<!--
--><div>{{#addbodyclass:Chapter-TOC}}</div><!--
--><!-- ------------------------------------------------------------------------------->


=== [[Practical method for determining the smallest allowable cross-sectional area of circuit conductors|Practical method for determining the smallest allowable cross-sectional area of circuit conductors]] ===
[[General method for cable sizing|General method for cable sizing]]
[[Recommended simplified approach for cable sizing|Recommended simplified approach for cable sizing]]
[[Busbar trunking systems|Busbar trunking systems]]
=== [[Determination of voltage drop|Determination of voltage drop]]  ===
[[Maximum voltage drop limit|Maximum voltage drop limit]]
[[Calculation of voltage drop in steady load conditions|Calculation of voltage drop in steady load conditions]]
=== [[Short-circuit current]]  ===
[[Short-circuit current at the secondary terminals of a MV/LV distribution transformer|Short-circuit current at the secondary terminals of a MV/LV distribution transformer]]
[[3-phase short-circuit current (Isc) at any point within a LV installation|3-phase short-circuit current (Isc) at any point within a LV installation]]
[[Isc at the receiving end of a feeder as a function of the Isc at its sending end|Isc at the receiving end of a feeder as a function of the Isc at its sending end]]
Short-circuit current supplied by an alternator or an inverter: refer to [[Characteristics of particular sources and loads]]
=== [[Particular cases of short-circuit current]]  ===
[[Calculation of minimum levels of short-circuit current|Calculation of minimum levels of short-circuit current]]
[[Verification of the withstand capabilities of cables under short-circuit conditions|Verification of the withstand capabilities of cables under short-circuit conditions]]<br>
=== [[Protective earthing conductor]]  ===
[[Connection and choice for protective earthing conductor|Connection and choice for protective earthing conductor]]
[[Sizing of protective earthing conductor|Sizing of protective earthing conductor]]
[[Protective conductor between MV/LV transformer and the main general distribution board (MGDB)|Protective conductor between MV/LV transformer and the main general distribution board (MGDB)]]
[[Equipotential conductor|Equipotential conductor]]
=== [[The neutral conductor]]  ===
[[Sizing the neutral conductor|Sizing the neutral conductor]]
[[Protection of the neutral conductor|Protection of the neutral conductor]]
[[Breaking of the neutral conductor|Breaking of the neutral conductor]]
[[Isolation of the neutral conductor|Isolation of the neutral conductor]]
=== [[Worked example of cable calculation|Worked example of cable calculation]]  ===
<br>
==External links==
==External links==
*[http://www.technical-publications.schneider-electric.com/sites/corporate/en/products-services/technical-publications/technical-publications.page Electrical Conceptual information given in "Cahiers Techniques"]
*[https://www.se.com/ww/en/product-category/26426075-energy-management-software-solutions/?filter=business-4-low-voltage-products-and-systems Electrical design software]
*[http://www.schneider-electric.com/products/ww/en/5100-software/5110-electrical-design-software/?BUSINESS=4 Electrical design software]


[[ru:Выбор сечения и защита проводников]]
<!-- ----------------------------------------------------------------------------------------
[[zh:电路保护]]
---- ADD BELOW external links, inter-language links, and possibly other related content links
-------------------------------------------------------------------------------------------->

Latest revision as of 13:46, 26 January 2024

Banner-chapter G.jpg

Selection of cross-sectional-areas of cables is certainly one of the most important tasks of the design process of an electrical installation as this greatly influences:

  • the selection of overcurrent protective devices,
  • the voltage drop along these conductors
  • and the estimation of the prospective short-circuit currents

This chapters details the different steps and methodologies for conductor sizing. And the specific recommendations for neutral and Protective Earth (PE) conductors sizing.

Chapter G - Contents

External links


Share