LV Distribution: Difference between revisions

From Electrical Installation Guide
Home > LV Distribution
(Created page with '== Stakes for the user == == Simplified architecture design process == ==== The architecture design ==== ===…')
 
m (1 revision imported: move to MW1.39)
 
(47 intermediate revisions by 7 users not shown)
Line 1: Line 1:
== [[Stakes for the user|Stakes for the user]] ==
<!-------------------------------------------------------------------------------------------------------------------------
----            define HERE the LETTER of this chapter (A...S). It is then used in different places further below, in this page
-------------------------v-------------------------------------------------------------------------------------------------
---->{{#vardefine:letter|E}}<!--


== [[Simplified architecture design process|Simplified architecture design process]] ==


==== The architecture design ====
--><div class="chapter-banner">[[File:Banner-chapter_{{#var:letter}}.jpg|class=chapter-banner-img|link=]]</div>
{{Highlightbox|text=
<!-----------------------------------------------------------------------------------------------------------------------------
---- Description text for this chapter - START
------------------------------------------------------------------------------------------------------------------------------>
This chapter introduces the following elements used to define the Low Voltage power distribution:
* the earthing schemes (TN, TT, IT) and their characteristics
* the different types of distribution equipment: switchboards, cables, and busways (busbar trunking systems)
* and the list of external influences defined by the IEC 60364-5-51
<!-----------------------------------------------------------------------------------------------------------------------------
---- Description text for this chapter - END
------------------------------------------------------------------------------------------------------------------------------>
}}
<!--


==== The whole process ====


== [[Electrical installation characteristics|Electrical installation characteristics]] ==
--><!-----------------------------------------------------------------------------------
---add chapter TOC, based on Hierarchy (DO NOT MODIFY!)
----------------------------------------------------------------------------------------
-->{{ch-toc|letter={{#var:letter}}}}


==== Activity ====
<!-- -----------------------------------------------------------------------------------
 
---- define all properties and categories for this chapter landing page (DO NOT MODIFY!)
==== Site topology  ====
----------------------------------------------------------------------------------------
 
-->__NOTOC__ __NOEDITSECTION__<!--
==== Layout latitude  ====
-->[[Has chapter letter::{{#var:letter}}| ]]<!--
 
-->{{#isin:{{MediaWiki:mainpage}}}}<!--
==== Service reliability  ====
-->[[Category:eig-ch-landing-pages]]<!--
 
-->{{ch-category|{{#var:letter}}}}<!--
==== Maintainability  ====
--><div>{{#addbodyclass:Chapter-TOC}}</div><!--
 
--><!-- ------------------------------------------------------------------------------->
==== Installation flexibility  ====
<!-- ----------------------------------------------------------------------------------------
 
---- ADD BELOW external links, inter-language links, and possibly other related content links
==== Power demand  ====
-------------------------------------------------------------------------------------------->
 
==== Load distribution  ====
 
==== Power interruption sensitivity  ====
 
==== Disturbance sensitivity  ====
 
==== Disturbance capability of circuits&nbsp; ====
 
==== Other considerations or constraints ====
 
== [[Technological characteristics|Technological characteristics]] ==
 
==== Environment, atmosphere ====
 
==== Service Index ====
 
==== Other considerations ====
 
== [[Architecture assessment criteria|Architecture assessment criteria]] ==
 
==== On-site work time ====
 
==== Environmental impact  ====
 
==== Preventive maintenance level  ====
 
==== Availability of electrical power supply ====
 
== [[Choice of architecture fundamentals|Choice of architecture fundamentals]] ==
 
==== Connection to the upstream network  ====
 
==== MV circuit configuration  ====
 
==== Number and distribution of MV/LV transformation substations  ====
 
==== Number of MV/LV transformers  ====
 
==== MV back-up generator ====
 
== [[Choice of architecture details|Choice of architecture details]] ==
 
==== Layout  ====
 
==== Centralized or distributed layout  ====
 
==== Presence of an Uninterruptible Power Supply (UPS) ====
 
==== Configuration of LV circuits ====
 
== [[Choice of equiment|Choice of equiment]] ==
 
== [[Recommendations for architecture optimization|Recommendations for architecture optimization]] ==
 
==== On-site work time  ====
 
==== Environmental impact  ====
 
==== Preventive maintenance volume  ====
 
==== Electrical power availability ====
 
== [[Glossary|Glossary]] ==
 
== [[ID-Spec software|ID-Spec software]] ==
 
== [[Example: electrical installation in a printworks|Example: electrical installation in a printworks]] ==
 
==== Brief description ====
 
==== Installation characteristics  ====
 
==== Technological characteristics  ====
 
==== Architecture assessment criteria  ====
 
==== Choice of technogical solutions  ====

Latest revision as of 13:46, 26 January 2024

Share