Sizing and protection of conductors: Difference between revisions

From Electrical Installation Guide
Home > Sizing and protection of conductors
(Created page with '== General  == ==== Electric shock ==== ==== Protection against electric shock ==== ==== Direct and indirect contact ==== == [[Protection against direct c…')
 
m (1 revision imported: move to MW1.39)
 
(44 intermediate revisions by 9 users not shown)
Line 1: Line 1:
== [[General |General ]] ==
<!-------------------------------------------------------------------------------------------------------------------------
----            define HERE the LETTER of this chapter (A...S). It is then used in different places further below, in this page
-------------------------v-------------------------------------------------------------------------------------------------
---->{{#vardefine:letter|G}}<!--


==== Electric shock  ====


==== Protection against electric shock  ====
--><div class="chapter-banner">[[File:Banner-chapter_{{#var:letter}}.jpg|class=chapter-banner-img|link=]]</div>
{{Highlightbox|text=
<!-----------------------------------------------------------------------------------------------------------------------------
---- Description text for this chapter - START
------------------------------------------------------------------------------------------------------------------------------>
Selection of cross-sectional-areas of cables is certainly one of the most important tasks of the design process of an electrical installation as this greatly influences:
* the selection of overcurrent protective devices,
* the voltage drop along these conductors
* and the estimation of the prospective short-circuit currents
This chapters details the different steps and methodologies for conductor sizing. And the specific recommendations for neutral and Protective Earth (PE) conductors sizing.
<!-----------------------------------------------------------------------------------------------------------------------------
---- Description text for this chapter - END
------------------------------------------------------------------------------------------------------------------------------>
}}
<!--


==== Direct and indirect contact ====


== [[Protection against direct contact |Protection against direct contact]] ==
--><!-----------------------------------------------------------------------------------
---add chapter TOC, based on Hierarchy (DO NOT MODIFY!)
----------------------------------------------------------------------------------------
-->{{ch-toc|letter={{#var:letter}}}}


==== Measures of protection against direct contact  ====
<!-- -----------------------------------------------------------------------------------
---- define all properties and categories for this chapter landing page (DO NOT MODIFY!)
----------------------------------------------------------------------------------------
-->__NOTOC__ __NOEDITSECTION__<!--
-->[[Has chapter letter::{{#var:letter}}| ]]<!--
-->{{#isin:{{MediaWiki:mainpage}}}}<!--
-->[[Category:eig-ch-landing-pages]]<!--
-->{{ch-category|{{#var:letter}}}}<!--
--><div>{{#addbodyclass:Chapter-TOC}}</div><!--
--><!-- ------------------------------------------------------------------------------->


==== Additional measure of protection against direct contact ====
==External links==
*[https://www.se.com/ww/en/product-category/26426075-energy-management-software-solutions/?filter=business-4-low-voltage-products-and-systems Electrical design software]


== [[Protection against indirect contact |Protection against indirect contact]] ==
<!-- ----------------------------------------------------------------------------------------
 
---- ADD BELOW external links, inter-language links, and possibly other related content links
==== Measures of protection: two levels ====
-------------------------------------------------------------------------------------------->
 
==== Automatic disconnection for TT system ====
 
==== Automatic disconnection for TN systems ====
 
==== Automatic disconnection on a second fault in an IT system ====
 
==== Measures of protection against direct or indirect contact without automatic disconnection of supply ====
 
== [[Protection of goods in case of insulation fault |Protection of goods in case of insulation fault]] ==
 
==== Measures of protection against fire risk with RCDs ====
 
==== Ground Fault Protection (GFP)  ====
 
== [[Implementation of the TT system|Implementation of the TT system]] ==
 
==== Protective measures ====
 
==== Coordination of residual current protective devices ====
 
== [[Implementation of the TN system|Implementation of the TN system]] ==
 
==== Preliminary conditions  ====
 
==== Protection against indirect contact ====
 
==== High-sensitivity RCDs  ====
 
==== Protection in high fire-risk locations&nbsp; ====
 
==== When the fault current-loop impedance is particularly high ====
 
== [[Implementation of the IT system |Implementation of the IT system]] ==
 
==== Preliminary conditions ====
 
==== Protection against indirect contact ====
 
==== High-sensitivity RCDs&nbsp; ====
 
==== Protection in high fire-risk locations ====
 
==== When the fault current-loop impedance is particularly high ====
 
== [[Residual current differential devices (RCDs)|Residual current differential devices (RCDs)]] ==
 
==== Types of RCDs ====
 
==== Description  ====
 
==== Sensitivity of RDCs to disturbances <br> ====

Latest revision as of 13:46, 26 January 2024

Banner-chapter G.jpg

Selection of cross-sectional-areas of cables is certainly one of the most important tasks of the design process of an electrical installation as this greatly influences:

  • the selection of overcurrent protective devices,
  • the voltage drop along these conductors
  • and the estimation of the prospective short-circuit currents

This chapters details the different steps and methodologies for conductor sizing. And the specific recommendations for neutral and Protective Earth (PE) conductors sizing.

Chapter G - Contents

External links


Share