Choice of architecture details: Difference between revisions

From Electrical Installation Guide
m (1 revision imported: Migrated pages - removed CN links)
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "")
 
Line 9: Line 9:


{{Section-TOC}}
{{Section-TOC}}
[[ru:Выбор архитектурных деталей]]

Latest revision as of 09:48, 22 June 2022

This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices:

  • Layout,
  • Centralized or decentralized distribution,
  • Presence of back-up generators,
  • Presence of uninterruptible power supplies,
  • Configuration of LV distribution,
  • Architecture combinations.
Share