Connection to the utility network: Difference between revisions

From Electrical Installation Guide
m (r2.7.2) (robot Adding: zh:与上级网络的连接)
m (cleaned up source: table format, etc ...)
Line 1: Line 1:
{{Menu_MV_&_LV_architecture_selection_guide}}
{{Menu_MV_and_LV_architecture_selection_guide}}
<br>
<br>
The main configurations for possible connection are as follows (see '''Fig. D8 '''for MV service):  
The main configurations for possible connection are as follows (see '''Fig. D8 '''for MV service):  
Line 13: Line 13:
----
----


<br>[[Image:FigD08.jpg|left|500px]] <br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br><br>'''''Fig. D8:'''&nbsp;MV connection to the utilities network''  
[[File:FigD08.jpg|none|500px]]
'''''Fig. D8:'''&nbsp;MV connection to the utilities network''  


----
----
Line 23: Line 24:
<br>
<br>


{| style="width: 65%; height: 187px" cellspacing="1" cellpadding="1" border="1"
{| class="wikitable" style="width: 65%; height: 187px"
|-
|-
| &nbsp;  
| &nbsp;  
| bgcolor="#0099cc" colspan="5" | '''Configuration'''
! colspan="5" | Configuration
|-
|-
| &nbsp;  
| &nbsp;  
| bgcolor="#0099cc" | '''LV'''
! LV  
| bgcolor="#0099cc" colspan="4" | '''MV'''
! colspan="4" | MV
|-
|-
| valign="top" bgcolor="#0099cc" | '''Characteristic to <br>consider'''
! Characteristic to <br>consider  
| bgcolor="#0099cc" |
!
| valign="top" bgcolor="#0099cc" | '''Simple-line'''
! Simple-line  
| valign="top" bgcolor="#0099cc" | '''Ring-main'''
! Ring-main  
| valign="top" bgcolor="#0099cc" | '''Duplicate supply'''
! Duplicate supply  
| valign="top" bgcolor="#0099cc" | '''Duplicate supply <br>with double <br>busbars'''
! Duplicate supply <br>with double <br>busbars
|-
|-
| valign="top" | Activity  
| Activity  
| valign="top" | Any  
| Any  
| valign="top" | Any  
| Any  
| valign="top" | Any  
| Any  
| Hi-tech, sensitive <br>office, health-care  
| Hi-tech, sensitive <br>office, health-care  
| valign="top" | Any
| Any
|-
|-
| Site topology  
| Site topology  
Line 74: Line 75:
| Urban area with utility constraint
| Urban area with utility constraint
|}
|}
<br>


----
----

Revision as of 13:10, 15 November 2013


The main configurations for possible connection are as follows (see Fig. D8 for MV service):

  • LV service,
  • MV single-line service,
  • MV ring-main service,
  • MV duplicate supply service,
  • MV duplicate supply service with double busbar.

Metering, protection, disconnection devices, located in the delivery substations are not represented on the following diagrams. They are often specific to each utilities company and do not have an influence on the choice of installation architecture.
For each connection, one single transformer is shown for simplification purposes, but in the practice, several transformers can be connected.(MLVS: Main Low Voltage Switchboard)


FigD08.jpg

Fig. D8: MV connection to the utilities network


For the different possible configurations, the most probable and usual set of characteristics is given in the following table:



  Configuration
  LV MV
Characteristic to
consider
Simple-line Ring-main Duplicate supply Duplicate supply
with double
busbars
Activity Any Any Any Hi-tech, sensitive
office, health-care
Any
Site topology Single building Single building Single building Single building Several buildings
Service reliability Minimal Minimal Standard Enhanced Enhanced
Power demand < 630kVA ≤ 1250kVA ≤ 2500kVA > 2500kVA > 2500kVA
Other connection constraints Any Isolated site Low density urban area High density urban area Urban area with utility constraint


ru:Подключение к питающей сети zh:与上级网络的连接

Share