Due to the specific characteristics of the generator and its regulation, the proper operating parameters of the generator set must be monitored when special loads are implemented.
Due to the specific characteristics of the generator and its regulation, the proper operating parameters of the generator set must be monitored when special loads are implemented.


The behaviour of the generator is different from that of the transformer:  
The behaviour of the generator is different from that of the transformer:  
*The active power it supplies is optimised for a power factor = 0.8  
*The active power it supplies is optimised for a power factor = 0.8  
*At less than power factor 0.8, the generator may, by increased excitation, supply part of the reactive power
*At less than power factor 0.8, the generator may, by increased excitation, supply part of the reactive power


== Capacitor bank  ==


__TOC__
An off-load generator connected to a capacitor bank may self-excite, consequently increasing its overvoltage.


== Capacitor bank  ==
The capacitor banks used for power factor regulation must therefore be disconnected. This operation can be performed by sending the stopping setpoint to the regulator (if it is connected to the system managing the source switchings) or by opening the circuit-breaker supplying the capacitors.


An off-load generator connected to a capacitor bank may self-excite, consequently increasing its overvoltage.<br>The capacitor banks used for power factor regulation must therefore be disconnected. This operation can be performed by sending the stopping setpoint to the regulator (if it is connected to the system managing the source switchings) or by opening the circuit-breaker supplying the capacitors.<br>If capacitors continue to be necessary, do not use regulation of the power factor relay in this case (incorrect and over-slow setting).<br>
If capacitors continue to be necessary, do not use regulation of the power factor relay in this case (incorrect and over-slow setting).  


== Motor restart and re-acceleration  ==
== Motor restart and re-acceleration  ==


A generator can supply at most in transient period a current of between 3 and 5 times its nominal current.<br>A motor absorbs roughly 6 In for 2 to 20 s during start-up.<br>If the sum of the motor power is high, simultaneous start-up of loads generates a high pick-up current that can be damaging. A large voltage drop, due to the high value of the generator transient and subtransient reactances will occur (20% to 30%), with a risk of:
A generator can supply at most in transient period a current of between 3 and 5 times its nominal current.
 
A motor absorbs roughly 6 In for 2 to 20 s during start-up.


If the sum of the motor power is high, simultaneous start-up of loads generates a high pick-up current that can be damaging. A large voltage drop, due to the high value of the generator transient and subtransient reactances will occur (20% to 30%), with a risk of:
*Non-starting of motors  
*Non-starting of motors  
*Temperature rise linked to the prolonged starting time due to the voltage drop  
*Temperature rise linked to the prolonged starting time due to the voltage drop  
Line 28: Line 33:
(see {{FigRef|N7}})
(see {{FigRef|N7}})


[[File:FigN07.jpg|none]]
{{FigImage|DB422645_EN|svg|N7|Restarting of priority motors (ΣP > 1/3 Pn)}}
'''''Fig N7:'''''<i>&nbsp;Restarting of priority motors (ΣP &gt; 1/3 Pn)</i>
 
A generator supplies a set of motors.
 
Generator characteristics: Sn = 130 kVA at a power factor of 0.8, Un=500V
 
In = 150 A


A generator supplies a set of motors.<br>Generator characteristics: Sn = 130 kVA at a power factor of 0.8, Un=500V<br>
In = 150 A<br>
x’d = 20% (for example) hence Isc = 750 A.
x’d = 20% (for example) hence Isc = 750 A.
    
    
*If the Σ Pmotors is 45 kW (45% of generator power)
*If the Σ Pmotors is 45 kW (45% of generator power)
Calculating voltage drop at start-up:<br>
Calculating voltage drop at start-up:
Σ PMotors = 45 kW, Im = 81 A, hence a starting current Id = 480 A for 2 to 20 s.<br>
 
Voltage drop on the busbar for simultaneous motor starting: <br>
Σ PMotors = 45 kW, Im = 81 A, hence a starting current Id = 480 A for 2 to 20 s.
<math>\frac {\Delta U}{U}=\left ( \frac{Id-In}{Isc-In} \right ) \cdot 100~~~in~\%</math> <br>
 
ΔU = 55%<br>
Voltage drop on the busbar for simultaneous motor starting:
 
<math>\frac {\Delta U}{U}=\left ( \frac{Id-In}{Isc-In} \right ) \cdot 100~~~in~\%</math>  
 
ΔU = 55%
 
which is not tolerable for motors (failure to start).  
which is not tolerable for motors (failure to start).  


*If the Σ Pmotors is 20 kW (20% of generator power)
*If the Σ Pmotors is 20 kW (20% of generator power)


Calculating voltage drop at start-up:<br>
Calculating voltage drop at start-up:
Σ PMotors = 20 kW, Im = 35 A, hence a starting current Id = 210 A for 2 to 20 s.<br>
 
Voltage drop on the busbar:<br>
Σ PMotors = 20 kW, Im = 35 A, hence a starting current Id = 210 A for 2 to 20 s.
<math>\frac {\Delta U}{U}=\left ( \frac{Id-In}{Isc-In} \right ) \cdot 100~~~in~\%</math> <br>
 
ΔU = 10%<br>
Voltage drop on the busbar:
 
<math>\frac {\Delta U}{U}=\left ( \frac{Id-In}{Isc-In} \right ) \cdot 100~~~in~\%</math>  
 
ΔU = 10%
 
which is high but tolerable (depending on the type of loads).  
which is high but tolerable (depending on the type of loads).  


=== Restarting tips ===
=== Restarting tips ===


*If the Pmax of the largest motor &gt; <math>\frac{1}{3}Pn</math>, a soft starter must be installed on this motor
*If the Pmax of the largest motor > <math>\frac{1}{3}Pn</math>, a soft starter must be installed on this motor
 
*If Σ Pmotors > <math>\frac{1}{3}Pn</math>, motor cascade restarting must be managed by a PLC  
*If Σ Pmotors &gt; <math>\frac{1}{3}Pn</math>, motor cascade restarting must be managed by a PLC  
*If Σ Pmotors > <math>\frac{1}{3}Pn</math>, there are no restarting problems
*If Σ Pmotors &lt; <math>\frac{1}{3}Pn</math>, there are no restarting problems
 


== Non-linear loads – Example of a UPS  ==
== Non-linear loads – Example of a UPS  ==
Line 65: Line 81:


These are mainly:  
These are mainly:  
*Saturated magnetic circuits  
*Saturated magnetic circuits  
*Discharge lamps, fluorescent lights  
*Discharge lamps, fluorescent lights  
Line 73: Line 88:
These loads generate harmonic currents: supplied by a Generator Set, this can create high voltage distortion due to the low short-circuit power of the generator.  
These loads generate harmonic currents: supplied by a Generator Set, this can create high voltage distortion due to the low short-circuit power of the generator.  


===Uninterruptible Power Supply (UPS) ===
=== Uninterruptible Power Supply (UPS) ===
(see {{FigRef|N8}})
(see {{FigRef|N8}})


[[File:FigN08.jpg|none]]
{{FigImage|DB422646_EN|svg|N8|Generator set- UPS combination for Quality energy}}
'''''Fig N8:'''''<i>&nbsp;Generator set- UPS combination for Quality energy</i>


The combination of a UPS and generator set is the best solution for ensuring quality power supply with long autonomy for the supply of sensitive loads.<br>It is also a non-linear load due to the input rectifier. On source switching, the autonomy of the UPS on battery must allow starting and connection of the Generator Set.  
The combination of a UPS and generator set is the best solution for ensuring quality power supply with long autonomy for the supply of sensitive loads.


===UPS power===
It is also a non-linear load due to the input rectifier. On source switching, the autonomy of the UPS on battery must allow starting and connection of the Generator Set.
 
=== UPS power ===


UPS inrush power must allow for:  
UPS inrush power must allow for:  
*Nominal power of the downstream loads. This is the sum of the apparent powers Pa absorbed by each application. Furthermore, so as not to oversize the installation, the overload capacities at UPS level must be considered (for example: 1.5 In for 1 minute and 1.25 In for 10 minutes)  
*Nominal power of the downstream loads. This is the sum of the apparent powers Pa absorbed by each application. Furthermore, so as not to oversize the installation, the overload capacities at UPS level must be considered (for example: 1.5 In for 1 minute and 1.25 In for 10 minutes)  
*The power required to recharge the battery: This current is proportional to the autonomy required for a given power. The sizing Sr of a UPS is given by: Sr = 1.17 x Pn
*The power required to recharge the battery: This current is proportional to the autonomy required for a given power. The sizing Sr of a UPS is given by: Sr = 1.17 x Pn
Line 90: Line 105:
{{FigureRef|N9}} defines the pick-up currents and protection devices for supplying the rectifier (Mains 1) and the standby mains (Mains 2).
{{FigureRef|N9}} defines the pick-up currents and protection devices for supplying the rectifier (Mains 1) and the standby mains (Mains 2).


{| class="wikitable"
{{TableStart|Tab1361|2col}}
|-
|-
! Nominal power<br>Pn (kVA)  
! Nominal power
! Current value (A)<br>Mains 1 with 3Ph battery (400 V - I1 )  
Pn (kVA)  
! Mains 2 or 3Ph application <br>400 V- Iu
! Current value (A)
Mains 1 with 3Ph battery (400 V - I1 )  
! Mains 2 or 3Ph application  
400 V- Iu
|-
|-
| 40  
| 40  
Line 147: Line 165:
| 1,648  
| 1,648  
| 1,215
| 1,215
|}
|-
 
{{TableEnd|Tab1361|N9|Pick-up current for supplying the rectifier and standby mains}}
'''''Fig N9:'''''<i>&nbsp;Pick-up current for supplying the rectifier and standby mains</i>


===Generator Set/UPS combination===
===Generator Set/UPS combination===


*&nbsp;Restarting the Rectifier on a Generator Set
*Restarting the Rectifier on a Generator Set
 
The UPS rectifier can be equipped with a progressive starting of the charger to prevent harmful pick-up currents when installation supply switches to the Generator Set (see {{FigRef|N10}}).
The UPS rectifier can be equipped with a progressive starting of the charger to prevent harmful pick-up currents when installation supply switches to the Generator Set (see {{FigRef|N10}}).


[[File:FigN10.jpg|none]]
{{FigImage|DB422647_EN|svg|N10|Progressive starting of a type 2 UPS rectifier}}
'''''Fig N10:'''''<i>&nbsp;Progressive starting of a type 2 UPS rectifier</i>


*Harmonics and voltage distortion
*Harmonics and voltage distortion
Total voltage distortion τ is defined by:


Total voltage distortion τ&nbsp; is defined by: <br><math>\tau(\%)=\frac {\sqrt {\Sigma U^2_h} }{U_1}</math>
<math>\tau(\%)=\frac {\sqrt {\Sigma U^2_h} }{U_1}</math>


where Uh is the harmonic voltage of order h.<br>This value depends on:<br>&nbsp; -&nbsp; The harmonic currents generated by the rectifier (proportional to the power Sr of the rectifier)<br>&nbsp; -&nbsp; The longitudinal subtransient reactance X”d of the generator <br>&nbsp; -&nbsp; The power Sg of the generator<br>&nbsp;<br>We define <math>U^{'}Rcc(\%)= X^{''}d\frac{Sr}{Sg}</math>&nbsp; the generator relative short-circuit voltage, brought to rectifier power, i.e. t = f(U’Rcc).<br>Note 1: As subtransient reactance is great, harmonic distortion is normally too high compared with the tolerated value (7 to 8%) for reasonable economic sizing of the generator: use of a suitable filter is an appropriate and cost-effective solution.<br>Note 2: Harmonic distortion is not harmful for the rectifier but may be harmful for the other loads supplied in parallel with the rectifier.  
where Uh is the harmonic voltage of order h.


===Application===
This value depends on:
:* The harmonic currents generated by the rectifier (proportional to the power Sr of the rectifier)
:* The longitudinal subtransient reactance X”d of the generator
:* The power Sg of the generator
 
We define <math>U^{'}Rcc(\%)= X^{''}d\frac{Sr}{Sg}</math>&nbsp; the generator relative short-circuit voltage, brought to rectifier power, i.e. t = f(U’Rcc).
 
'''Note 1''': As subtransient reactance is great, harmonic distortion is normally too high compared with the tolerated value (7 to 8%) for reasonable economic sizing of the generator: use of a suitable filter is an appropriate and cost-effective solution.
 
'''Note 2''': Harmonic distortion is not harmful for the rectifier but may be harmful for the other loads supplied in parallel with the rectifier.
 
=== Application ===


A chart is used to find the distortion&nbsp;τ as a function of U’Rcc (see {{FigRef|N11}}).
A chart is used to find the distortion&nbsp;τ as a function of U’Rcc (see {{FigRef|N11}}).


[[File:FigN11.jpg|none]]
{{FigImage|DB422648_EN|svg|N11|Chart for calculating harmonic distorsion}}
'''''Fig N11:'''''<i>&nbsp;Chart for calculating harmonic distorsion</i>


'''The chart gives:'''  
'''The chart gives:'''  
Line 186: Line 212:
The power Sr of the rectifier is Sr = 1.17 x 300 kVA = 351 kVA  
The power Sr of the rectifier is Sr = 1.17 x 300 kVA = 351 kVA  


For a τ &lt; 7%, the chart gives U’Rcc = 4%, power Sg is:<br><math>Sg=351 \times \frac{15}{4}\approx 1,400\, kVA</math>  
For a τ < 7%, the chart gives U’Rcc = 4%, power Sg is:
 
<math>Sg=351 \times \frac{15}{4}\approx 1,400\, kVA</math>  


*300 kVA UPS with filter, subtransient reactance of 15%
*300 kVA UPS with filter, subtransient reactance of 15%


For τ = 5%, the calculation gives U’Rcc = 12%, power Sg is:<br><math>Sg=351 \times \frac{15}{12}\approx 500\, kVA</math>
For τ = 5%, the calculation gives U’Rcc = 12%, power Sg is:
 
<math>Sg=351 \times \frac{15}{12}\approx 500\, kVA</math>
 
'''Note''': With an upstream transformer of 630 kVA on the 300 kVA UPS without filter, the 5% ratio would be obtained.
 
The result is that operation on generator set must be continually monitored for harmonic currents.


'''Note''': With an upstream transformer of 630 kVA on the 300 kVA UPS without filter, the 5% ratio would be obtained.<br>The result is that operation on generator set must be continually monitored for harmonic currents.<br>If voltage harmonic distortion is too great, use of a filter on the network is the most effective solution to bring it back to values that can be tolerated by sensitive loads.
If voltage harmonic distortion is too great, use of a filter on the network is the most effective solution to bring it back to values that can be tolerated by sensitive loads.


[[ru:Контроль генераторной установки]]
[[ru:Контроль генераторной установки]]
[[zh:发电机监控功能]]
[[zh:发电机监控功能]]

Revision as of 00:17, 9 December 2016


Due to the specific characteristics of the generator and its regulation, the proper operating parameters of the generator set must be monitored when special loads are implemented.

The behaviour of the generator is different from that of the transformer:

  • The active power it supplies is optimised for a power factor = 0.8
  • At less than power factor 0.8, the generator may, by increased excitation, supply part of the reactive power

Capacitor bank

An off-load generator connected to a capacitor bank may self-excite, consequently increasing its overvoltage.

The capacitor banks used for power factor regulation must therefore be disconnected. This operation can be performed by sending the stopping setpoint to the regulator (if it is connected to the system managing the source switchings) or by opening the circuit-breaker supplying the capacitors.

If capacitors continue to be necessary, do not use regulation of the power factor relay in this case (incorrect and over-slow setting).

Motor restart and re-acceleration

A generator can supply at most in transient period a current of between 3 and 5 times its nominal current.

A motor absorbs roughly 6 In for 2 to 20 s during start-up.

If the sum of the motor power is high, simultaneous start-up of loads generates a high pick-up current that can be damaging. A large voltage drop, due to the high value of the generator transient and subtransient reactances will occur (20% to 30%), with a risk of:

  • Non-starting of motors
  • Temperature rise linked to the prolonged starting time due to the voltage drop
  • Tripping of the thermal protection devices

Moreover, all the network and actuators are disturbed by the voltage drop.

Application

(see Fig. N7)

Fig. N7 – Restarting of priority motors (ΣP > 1/3 Pn)

A generator supplies a set of motors.

Generator characteristics: Sn = 130 kVA at a power factor of 0.8, Un=500V

In = 150 A

x’d = 20% (for example) hence Isc = 750 A.

  • If the Σ Pmotors is 45 kW (45% of generator power)

Calculating voltage drop at start-up:

Σ PMotors = 45 kW, Im = 81 A, hence a starting current Id = 480 A for 2 to 20 s.

Voltage drop on the busbar for simultaneous motor starting:

[math]\displaystyle{ \frac {\Delta U}{U}=\left ( \frac{Id-In}{Isc-In} \right ) \cdot 100~~~in~\% }[/math]

ΔU = 55%

which is not tolerable for motors (failure to start).

  • If the Σ Pmotors is 20 kW (20% of generator power)

Calculating voltage drop at start-up:

Σ PMotors = 20 kW, Im = 35 A, hence a starting current Id = 210 A for 2 to 20 s.

Voltage drop on the busbar:

[math]\displaystyle{ \frac {\Delta U}{U}=\left ( \frac{Id-In}{Isc-In} \right ) \cdot 100~~~in~\% }[/math]

ΔU = 10%

which is high but tolerable (depending on the type of loads).

Restarting tips

  • If the Pmax of the largest motor > [math]\displaystyle{ \frac{1}{3}Pn }[/math], a soft starter must be installed on this motor
  • If Σ Pmotors > [math]\displaystyle{ \frac{1}{3}Pn }[/math], motor cascade restarting must be managed by a PLC
  • If Σ Pmotors > [math]\displaystyle{ \frac{1}{3}Pn }[/math], there are no restarting problems

Non-linear loads – Example of a UPS

Non-linear loads

These are mainly:

  • Saturated magnetic circuits
  • Discharge lamps, fluorescent lights
  • Electronic converters
  • Information Technology Equipment: PC, computers, etc.

These loads generate harmonic currents: supplied by a Generator Set, this can create high voltage distortion due to the low short-circuit power of the generator.

Uninterruptible Power Supply (UPS)

(see Fig. N8)

Fig. N8 – Generator set- UPS combination for Quality energy

The combination of a UPS and generator set is the best solution for ensuring quality power supply with long autonomy for the supply of sensitive loads.

It is also a non-linear load due to the input rectifier. On source switching, the autonomy of the UPS on battery must allow starting and connection of the Generator Set.

UPS power

UPS inrush power must allow for:

  • Nominal power of the downstream loads. This is the sum of the apparent powers Pa absorbed by each application. Furthermore, so as not to oversize the installation, the overload capacities at UPS level must be considered (for example: 1.5 In for 1 minute and 1.25 In for 10 minutes)
  • The power required to recharge the battery: This current is proportional to the autonomy required for a given power. The sizing Sr of a UPS is given by: Sr = 1.17 x Pn

Figure N9 defines the pick-up currents and protection devices for supplying the rectifier (Mains 1) and the standby mains (Mains 2).

Nominal power

Pn (kVA)

Current value (A)

Mains 1 with 3Ph battery (400 V - I1 )

Mains 2 or 3Ph application

400 V- Iu

40 86 60.5
60 123 91
80 158 121
100 198 151
120 240 182
160 317 243
200 395 304
250 493 360
300 590 456
400 793 608
500 990 760
600 1,180 912
800 1,648 1,215
Fig. N9 – Pick-up current for supplying the rectifier and standby mains

Generator Set/UPS combination

  • Restarting the Rectifier on a Generator Set

The UPS rectifier can be equipped with a progressive starting of the charger to prevent harmful pick-up currents when installation supply switches to the Generator Set (see Fig. N10).

Fig. N10 – Progressive starting of a type 2 UPS rectifier
  • Harmonics and voltage distortion

Total voltage distortion τ is defined by:

[math]\displaystyle{ \tau(\%)=\frac {\sqrt {\Sigma U^2_h} }{U_1} }[/math]

where Uh is the harmonic voltage of order h.

This value depends on:

  • The harmonic currents generated by the rectifier (proportional to the power Sr of the rectifier)
  • The longitudinal subtransient reactance X”d of the generator
  • The power Sg of the generator

We define [math]\displaystyle{ U^{'}Rcc(\%)= X^{''}d\frac{Sr}{Sg} }[/math]  the generator relative short-circuit voltage, brought to rectifier power, i.e. t = f(U’Rcc).

Note 1: As subtransient reactance is great, harmonic distortion is normally too high compared with the tolerated value (7 to 8%) for reasonable economic sizing of the generator: use of a suitable filter is an appropriate and cost-effective solution.

Note 2: Harmonic distortion is not harmful for the rectifier but may be harmful for the other loads supplied in parallel with the rectifier.

Application

A chart is used to find the distortion τ as a function of U’Rcc (see Fig. N11).

Fig. N11 – Chart for calculating harmonic distorsion

The chart gives:

  • Either τ as a function of U’Rcc
  • Or U’Rcc as a function of τ

From which generator set sizing, Sg, is determined.

Example: Generator sizing

  • 300 kVA UPS without filter, subtransient reactance of 15%

The power Sr of the rectifier is Sr = 1.17 x 300 kVA = 351 kVA

For a τ < 7%, the chart gives U’Rcc = 4%, power Sg is:

[math]\displaystyle{ Sg=351 \times \frac{15}{4}\approx 1,400\, kVA }[/math]

  • 300 kVA UPS with filter, subtransient reactance of 15%

For τ = 5%, the calculation gives U’Rcc = 12%, power Sg is:

[math]\displaystyle{ Sg=351 \times \frac{15}{12}\approx 500\, kVA }[/math]

Note: With an upstream transformer of 630 kVA on the 300 kVA UPS without filter, the 5% ratio would be obtained.

The result is that operation on generator set must be continually monitored for harmonic currents.

If voltage harmonic distortion is too great, use of a filter on the network is the most effective solution to bring it back to values that can be tolerated by sensitive loads.