Main Page: Difference between revisions

From Electrical Installation Guide
No edit summary
No edit summary
Line 1: Line 1:
__NOTOC__ __NOEDITSECTION__ <!-------------------------------------------------------------
__NOTOC__
__NOEDITSECTION__
<!-------------------------------------------------------------
                         ENTÊTE DE BIENVENUE
                         ENTÊTE DE BIENVENUE
-------------------------------------------------------------->  
-------------------------------------------------------------->
 
{| id="mp-topbanner" style="width:100%; background:#fcfcfc; margin-top:-30px; border:1px solid #ccc;"
{| style="width: 100%; background: none repeat scroll 0% 0% rgb(252, 252, 252); margin-top: -30px; border: 1px solid rgb(204, 204, 204);" id="mp-topbanner"
| style="width:56%; color:#000;" |
|-
{| style="width:280px; border:none; background:none;"
| style="width: 56%; color: rgb(0, 0, 0);" |  
| style="width:280px; text-align:left; white-space:nowrap; color:#000;" |
{| style="width: 280px; border: medium none; background: none repeat scroll 0% 0% transparent;"
<div style="font-size:162%; border:none; margin:0; padding:.1em;  
|-
color:#000;">Welcome to [[WIKI-EIG]]</div><div style="font-size:130%; border:none; margin:0; padding:.1em; color:#000;">Wiki Electrical  
| style="width: 280px; text-align: left; white-space: nowrap; color: rgb(0, 0, 0);" | <div style="font-size: 162%; border: medium none; margin: 0pt; padding: 0.1em; color: rgb(0, 0, 0);">Welcome to [[WIKI-EIG]]</div><div style="font-size: 130%; border: medium none; margin: 0pt; padding: 0.1em; color: rgb(0, 0, 0);">Wiki Electrical Installation Guide</div><br> <div style="top: 0.2em; font-size: 95%;">From a [http://www.schneider-electric.com/sites/corporate/en/home.page Schneider-Electric] guide to an open content collaboration encyclopaedia.</div> <div style="width: 100%; text-align: left; font-size: 95%;" id="articlecount">[[Special:Statistics|{{NUMBEROFPAGES}}]] pages that you can improve and complete</div>
Installation Guide</div><br>
<div style="top:+0.2em; font-size:95%;">Moving from a Schneider-Electric  
guide to an open content collaboration encyclopaedia.</div>
<div id="articlecount" style="width:100%; text-align:left; font-size:95%;">[[Special:Statistics|{{NUMBEROFPAGES}}]] pages  
that you can improve and complete</div>
|}
|}
|}
|}


<!-------------------------------------------------------------
<!-------------------------------------------------------------
                         SUMMARY
                         SUMMARY
-------------------------------------------------------------->  
-------------------------------------------------------------->
 
{| id="mp-upper" style="margin:0; background:none; margin-top:8px;"
{| style="margin: 8px 0pt 0pt; background: none repeat scroll 0% 0% transparent;" id="mp-upper"
| class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5fffa; vertical-align:top; color:#000;" |
{| id="mp-left" style="width:100%; vertical-align:top; background:#f5fffa;"
|-
|-
| style="width: 55%; border: 1px solid rgb(206, 242, 224); background: none repeat scroll 0% 0% rgb(245, 255, 250); vertical-align: top; color: rgb(0, 0, 0);" class="MainPageBG" |
! style="padding:2px" | <h2 id="mp-dyk-h2" style="margin:3px;  
{| style="width: 100%; vertical-align: top; background: none repeat scroll 0% 0% rgb(245, 255, 250);" id="mp-left"
background:#cef2e0; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">Electrical
Installation Guide Summary</h2>
|-
|-
! style="padding: 2px;" |
| style="color:#000;padding:2px 5px 5px" | <div id="mp-dyk">
== Electrical Installation Guide Summary  ==
 
|-
| style="color: rgb(0, 0, 0); padding: 2px 5px 5px;" | <div id="mp-dyk">
=== [[General rules of electrical installation design|General rules of electrical installation design&nbsp;]]  ===
=== [[General rules of electrical installation design|General rules of electrical installation design&nbsp;]]  ===
 
This category presents the general rules for designing an installation and presents the involved IEC standards. It gives help in calculation of installed power loads.<br>
This category presents the general rules for designing an installation and presents the involved IEC standards. It gives help in calculation of installed power loads.<br>  


=== [[Connection to the MV utility distribution network|Connection to the MV utility distribution network&nbsp;]]  ===
=== [[Connection to the MV utility distribution network|Connection to the MV utility distribution network&nbsp;]]  ===
This chapter presents the main methods of connection to the MV utility distribution network.  
This chapter presents the main methods of connection to the MV utility distribution network.  


=== [[Connection to the LV utility distribution network|Connection to the LV utility distribution network]]  ===
=== [[Connection to the LV utility distribution network|Connection to the LV utility distribution network]]  ===
This chapter presents the main methods of connection to the&nbsp;LV utility distribution network.  
This chapter presents the main methods of connection to the&nbsp;LV utility distribution network.  


=== [[MV & LV architecture selection guide|MV &amp; LV architecture selection guide&nbsp;]]  ===
=== [[MV & LV architecture selection guide|MV &amp; LV architecture selection guide&nbsp;]]  ===
Given a particular building, we show how to select the right solution during pre-design and budget step: find a compromise between costs and ratings of the installation during its whole life cycle.  
Given a particular building, we show how to select the right solution during pre-design and budget step: find a compromise between costs and ratings of the installation during its whole life cycle.  


=== [[LV Distribution|LV Distribution]]  ===
=== [[LV Distribution|LV Distribution]]  ===
Conception rules of an electrical installation. System earthings.  
Conception rules of an electrical installation. System earthings.  


=== [[Protection against electric shocks|Protection against electric shocks&nbsp;]]  ===
=== [[Protection against electric shocks|Protection against electric shocks&nbsp;]]  ===
This chapter explains how to determine protective devices in order to protect people from direct &amp; indirect contacts and to protect equipments and goods from fire risks.  
This chapter explains how to determine protective devices in order to protect people from direct &amp; indirect contacts and to protect equipments and goods from fire risks.  


=== [[Sizing and protection of conductors|Sizing and protection of conductors&nbsp;]]  ===
=== [[Sizing and protection of conductors|Sizing and protection of conductors&nbsp;]]  ===
Practical methods for conductor sizing and protection are given.  
Practical methods for conductor sizing and protection are given.  


=== [[LV switchgear: functions & selection|LV switchgear: functions &amp; selection&nbsp;]]  ===
=== [[LV switchgear: functions & selection|LV switchgear: functions &amp; selection&nbsp;]]  ===
The basic functions of LV switchgear are described, as well as the selection rules for ensuring the protection coordination.  
The basic functions of LV switchgear are described, as well as the selection rules for ensuring the protection coordination.  


=== [[Protection against voltage surges in LV|Protection against voltage surges in LV]] ===
=== [[Overvoltage protection|Overvoltage protection]] ===
 
The effects of lightning are described. Protective devices are proposed and implementation rules are given.  
The effects of lightning are described. Protective devices are proposed and implementation rules are given.  


=== [[Energy Efficiency in electrical distribution|Energy Efficiency in electrical distribution]]  ===
=== [[Energy Efficiency in electrical distribution|Energy Efficiency in electrical distribution]]  ===
Power monitoring and control system contributes to global "energy efficiency". Such a system is of high benefice for the owner of an electrical network.  
Power monitoring and control system contributes to global "energy efficiency". Such a system is of high benefice for the owner of an electrical network.  


=== [[Power factor correction and harmonic filtering|Power factor correction and harmonic filtering]]  ===
=== [[Power factor correction and harmonic filtering|Power factor correction and harmonic filtering]]  ===
This chapter explains how power factor correction is implemented in LV electrical installation. Practical examples are given.  
This chapter explains how power factor correction is implemented in LV electrical installation. Practical examples are given.  


=== [[Harmonic management|Harmonic management]]  ===
=== [[Harmonic management|Harmonic management]]  ===
The origin and effects of harmonics are described. Measurement and filtering methods are proposed.  
The origin and effects of harmonics are described. Measurement and filtering methods are proposed.  


=== [[Characteristics of particular sources and loads|Characteristics of particular sources and loads]]  ===
=== [[Characteristics of particular sources and loads|Characteristics of particular sources and loads]]  ===
Specific sources and loads are studied: generators, inverters, induction motors, lighting circuits, LV/LV transformers...  
Specific sources and loads are studied: generators, inverters, induction motors, lighting circuits, LV/LV transformers...  


Line 82: Line 72:


=== [[Residential and other special locations|Residential and other special locations]]  ===
=== [[Residential and other special locations|Residential and other special locations]]  ===
The specific intallations rules applicable to residential premises and some other locations are presented.  
The specific intallations rules applicable to residential premises and some other locations are presented.  


=== [[EMC guidelines|EMC guidelines]]  ===
=== [[EMC guidelines|EMC guidelines]]  ===
 
This chapter describes the basic rules for ensuring EMC: earthing principles, cable lay-out, wiring recommandations.
This chapter describes the basic rules for ensuring EMC: earthing principles, cable lay-out, wiring recommandations.  
</div>
</div>
|}
|}


| style="border: 1px solid transparent;" | <!-------------------------------------------------------------
| style="border:1px solid transparent;" |
 
 
<!-------------------------------------------------------------
                         NEWS
                         NEWS
-------------------------------------------------------------->  
-------------------------------------------------------------->
| style="width: 45%; border: 1px solid rgb(206, 223, 242); background: none repeat scroll 0% 0% rgb(245, 250, 255); vertical-align: top;" class="MainPageBG" |  
| class="MainPageBG" style="width:45%; border:1px solid #cedff2; background:#f5faff; vertical-align:top;"|
{| style="width: 100%; vertical-align: top; background: none repeat scroll 0% 0% rgb(245, 250, 255);" id="mp-right"
{| id="mp-right" style="width:100%; vertical-align:top; background:#f5faff;"
! style="padding:2px" | <h2 id="mp-itn-h2" style="margin:3px; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">News</h2>
|-
|-
! style="padding: 2px;" |  
| style="color:#000;padding:2px 5px" | <div id="mp-itn">{{news}}</div>
== News  ==


|-
<!-------------------------------------------------------------
| style="color: rgb(0, 0, 0); padding: 2px 5px;" | <div id="mp-itn">{{news}}</div> <!-------------------------------------------------------------
                         HIGHLIGHTS
                         HIGHLIGHTS
-------------------------------------------------------------->
-------------------------------------------------------------->
|-
|-
! style="padding: 2px;" |  
! style="padding:2px" | <h2 id="mp-otd-h2" style="margin:3px; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Highlights</h2>
== Highlights ==
 
|-
|-
| style="color: rgb(0, 0, 0); padding: 2px 5px 5px;" | <div id="mp-otd">{{Highlights}}</div>
| style="color:#000;padding:2px 5px 5px" | <div id="mp-otd">{{Highlights}}</div>
|}
|}
|}
|}

Revision as of 15:47, 9 March 2010


Welcome to WIKI-EIG
Wiki Electrical Installation Guide

Moving from a Schneider-Electric guide to an open content collaboration encyclopaedia.
3,529 pages that you can improve and complete

Electrical Installation Guide Summary

General rules of electrical installation design 

This category presents the general rules for designing an installation and presents the involved IEC standards. It gives help in calculation of installed power loads.

Connection to the MV utility distribution network 

This chapter presents the main methods of connection to the MV utility distribution network.

Connection to the LV utility distribution network

This chapter presents the main methods of connection to the LV utility distribution network.

MV & LV architecture selection guide 

Given a particular building, we show how to select the right solution during pre-design and budget step: find a compromise between costs and ratings of the installation during its whole life cycle.

LV Distribution

Conception rules of an electrical installation. System earthings.

Protection against electric shocks 

This chapter explains how to determine protective devices in order to protect people from direct & indirect contacts and to protect equipments and goods from fire risks.

Sizing and protection of conductors 

Practical methods for conductor sizing and protection are given.

LV switchgear: functions & selection 

The basic functions of LV switchgear are described, as well as the selection rules for ensuring the protection coordination.

Overvoltage protection

The effects of lightning are described. Protective devices are proposed and implementation rules are given.

Energy Efficiency in electrical distribution

Power monitoring and control system contributes to global "energy efficiency". Such a system is of high benefice for the owner of an electrical network.

Power factor correction and harmonic filtering

This chapter explains how power factor correction is implemented in LV electrical installation. Practical examples are given.

Harmonic management

The origin and effects of harmonics are described. Measurement and filtering methods are proposed.

Characteristics of particular sources and loads

Specific sources and loads are studied: generators, inverters, induction motors, lighting circuits, LV/LV transformers...

Photovoltaic installations

Residential and other special locations

The specific intallations rules applicable to residential premises and some other locations are presented.

EMC guidelines

This chapter describes the basic rules for ensuring EMC: earthing principles, cable lay-out, wiring recommandations.


News

Highlights

New content on Ultra Rapid circuit breaker

UR figure 4.jpg
As installed power increases, electrical distribution has to shift from a LV design to a HV design. Indeed, a high short-circuit level can be a threat to the installation and make impossible the selection of low voltage equipments (Switchboard and bus bars, circuit breaker…)


These situations can be met in the following applications:
Bus bars coupling onboard merchant vessels, off shore platform, loop networks (in industry), where the current and energy are important because of the installed power (several transformers or generators in parallel) and HV design not easy. <more>


Electrical protection against surges

Highlight foudre.jpg

6 pages dedicated to electrical protection against surges have just been fully updated.
In addition to describing the operation of the surge arrester, the emphasis is on the method of choice and their location in the architecture of the electrical installation. Similarly the security of the facility is an essential element; coordination table between the arrester and its short circuit protection device is proposed. This is the result of extensive studies and tests in laboratories conducted by specialists which expertise is about short circuit breaking and lightning electromagnetic phenomena.

Pages:

Share