On-site work time: Difference between revisions

From Electrical Installation Guide
(Created page with '{{Menu_MV_&_LV_architecture_selection_guide}} <br> Time for implementing the electrical equipment on the site. ===== Different levels of priority ===== *Secondary: the on-sit…')
 
Line 8: Line 8:
*Special: the on-site work time must be minimized, without generating any significant excess cost,  
*Special: the on-site work time must be minimized, without generating any significant excess cost,  
*Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,<br>
*Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,<br>
[[ru:Длительность монтажа]]

Revision as of 14:14, 14 September 2012


Time for implementing the electrical equipment on the site.

Different levels of priority
  • Secondary: the on-site work time can be extended, if this gives a reduction in overall installation costs,
  • Special: the on-site work time must be minimized, without generating any significant excess cost,
  • Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,