On-site work time: Difference between revisions
From Electrical Installation Guide
m (1 revision) |
(Text modified (guide 2015)) |
||
Line 5: | Line 5: | ||
===== Different levels of priority ===== | ===== Different levels of priority ===== | ||
* | * Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs, | ||
*Special: the on-site work time must be minimized, without generating any significant excess cost, | * Special: the on-site work time must be minimized, without generating any significant excess cost, | ||
*Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost, | * Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost, | ||
[[ru:Длительность монтажа]] | [[ru:Длительность монтажа]] | ||
[[zh:现场工作时间]] | [[zh:现场工作时间]] |
Revision as of 09:51, 5 December 2014
Time for implementing the electrical equipment on the site.
Different levels of priority
- Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs,
- Special: the on-site work time must be minimized, without generating any significant excess cost,
- Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,