Internal MV circuits are dedicated to the supply of the secondary MV/LV substations dispersed in the installation. They are three typical principles commonly used for this purpose '''(Fig. D11):''' | |||
* Single feeder | |||
* Dual feeder | |||
* Open ring | |||
'''Fig. D11:''' Single feeder, Dual feeder, Open ring | |||
Comparison of these three typical principles of internal distribution is given '''Fig D12.''' | |||
{| class="wikitable" style="width: 65%; height: 122px" | {| class="wikitable" style="width: 65%; height: 122px" | ||
Line 29: | Line 20: | ||
! Characteristic to consider | ! Characteristic to consider | ||
! Single feeder | ! Single feeder | ||
! Open ring | ! Open ring | ||
! | ! Dual feeder | ||
|- | |- | ||
| Site topology | | Site topology | ||
| Any | | Any | ||
| | | Single or several buildings | ||
| | | Single or several buildings | ||
|- | |- | ||
| Power demand | | Power demand | ||
| Any | | Any | ||
| | | > 1250kVA | ||
| | | > 2500kVA | ||
|- | |- | ||
| Disturbance sensitivity | | Disturbance sensitivity | ||
| Long interruption acceptable | | Long interruption acceptable | ||
| Short interruption acceptable | | Short interruption acceptable | ||
| Short interruption acceptable | | Short interruption not acceptable | ||
|} | |} | ||
'''Fig. D12:''' Comparison of the typical internal circuits | |||
[[ru:Конфигурация схемы высокого напряжения]] | [[ru:Конфигурация схемы высокого напряжения]] | ||
[[zh:中压回路的配置]] | [[zh:中压回路的配置]] |
Revision as of 03:24, 8 December 2014
Internal MV circuits are dedicated to the supply of the secondary MV/LV substations dispersed in the installation. They are three typical principles commonly used for this purpose (Fig. D11):
- Single feeder
- Dual feeder
- Open ring
Fig. D11: Single feeder, Dual feeder, Open ring
Comparison of these three typical principles of internal distribution is given Fig D12.
MV circuit configuration | |||
---|---|---|---|
Characteristic to consider | Single feeder | Open ring | Dual feeder |
Site topology | Any | Single or several buildings | Single or several buildings |
Power demand | Any | > 1250kVA | > 2500kVA |
Disturbance sensitivity | Long interruption acceptable | Short interruption acceptable | Short interruption not acceptable |
Fig. D12: Comparison of the typical internal circuits