| Time for implementing the electrical equipment on the site.
| |
| | |
| == Different levels of priority ==
| |
| | |
| * Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs,
| |
| * Special: the on-site work time must be minimized, without generating any significant excess cost,
| |
| * Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,
| |
| | |