Electrical installation characteristics: Difference between revisions

From Electrical Installation Guide
Home > MV and LV architecture selection guide for buildings > Electrical installation characteristics
m (1 revision: no page modification, previous revision = imported ch.D pages cleaned-up)
(Cleanup_2016)
Line 11: Line 11:


=== Commercial ===
=== Commercial ===
* Premises designed and constructed for commercial operations <ref name="Ref1" />
* Premises designed and constructed for commercial operations{{fn|1}}


=== Industry ===
=== Industry ===
* Premises designed and constructed for manufacturing and processing of operations <ref name="Ref2" />
* Premises designed and constructed for manufacturing and processing of operations{{fn|2}}


=== Infrastructure ===
=== Infrastructure ===
* Systems or premises designed and constructed for the transport and utility operation <ref name="Ref3" />
* Systems or premises designed and constructed for the transport and utility operation{{fn|3}}
 


== Site topology ==
== Site topology ==
Line 27: Line 26:


=== Different categories: ===
=== Different categories: ===


*Single storey building,  
*Single storey building,  
Line 33: Line 31:
*Multi-building site,  
*Multi-building site,  
*High-rise building.
*High-rise building.


== Layout latitude ==
== Layout latitude ==
Line 40: Line 37:


Characteristic taking account of constraints in terms of the layout of the electrical equipment in the building:  
Characteristic taking account of constraints in terms of the layout of the electrical equipment in the building:  
*aesthetics,  
*aesthetics,  
*accessibility,  
*accessibility,  
*presence of dedicated locations,  
*presence of dedicated locations,  
*use of technical corridors (per floor),  
*use of technical corridors (per floor),  
*use of technical ducts (vertical).'''<br>'''
*use of technical ducts (vertical).


=== Different categories:  ===
=== Different categories:  ===
Line 52: Line 48:
*Medium: the position of the electrical equipment is partially imposed, to the detriment of the criteria to be satisfied  
*Medium: the position of the electrical equipment is partially imposed, to the detriment of the criteria to be satisfied  
*High: no constraints.The position of the electrical equipment can be defined to best satisfy the criteria.
*High: no constraints.The position of the electrical equipment can be defined to best satisfy the criteria.


== Service reliability  ==
== Service reliability  ==
Line 58: Line 53:
=== Definition:  ===
=== Definition:  ===


The ability of a power system to meet its supply function under stated conditions for a specified period of time.<br>
The ability of a power system to meet its supply function under stated conditions for a specified period of time.


=== Different categories:  ===
=== Different categories:  ===
Line 65: Line 60:
*Standard  
*Standard  
*Enhanced: this level of service reliability can be obtained by special measures taken to reduce the probability of interruption (underground network, strong meshing, etc.)
*Enhanced: this level of service reliability can be obtained by special measures taken to reduce the probability of interruption (underground network, strong meshing, etc.)


== Maintainability  ==
== Maintainability  ==
Line 78: Line 72:
*Standard: maintenance operations can be carried out during installation operations, but with deteriorated performance. These operations must be preferably scheduled during periods of low activity. Example: several transformers with partial redundancy and load shedding.  
*Standard: maintenance operations can be carried out during installation operations, but with deteriorated performance. These operations must be preferably scheduled during periods of low activity. Example: several transformers with partial redundancy and load shedding.  
*Enhanced: special measures are taken to allow maintenance operations without disturbing the installation operations. Example: double-ended configuration.
*Enhanced: special measures are taken to allow maintenance operations without disturbing the installation operations. Example: double-ended configuration.


== Installation flexibility  ==
== Installation flexibility  ==
Line 92: Line 85:
*Implementation flexibility: the loads can be installed after the installation is commissioned.  
*Implementation flexibility: the loads can be installed after the installation is commissioned.  
*Operating flexibility: the position of loads will fluctuate, according to process re-organization.
*Operating flexibility: the position of loads will fluctuate, according to process re-organization.
 
**industrial building: extension, splitting and changing usage
Examples:<br>&nbsp;&nbsp;&nbsp; '''-''' industrial building: extension, splitting and changing usage<br>&nbsp;&nbsp;&nbsp; - office building: splitting  
**office building: splitting  
 


== Power demand  ==
== Power demand  ==
Line 105: Line 97:
* from 1250 to 2500kVA
* from 1250 to 2500kVA
* > 2500kVA
* > 2500kVA


== Load distribution  ==
== Load distribution  ==
Line 115: Line 106:
=== Different categories:  ===
=== Different categories:  ===


*Uniform distribution: the loads are generally of an average or low unit power and spread throughout the surface area or over a large area of the building (uniform density).<br>E.g.: lighting, individual workstations
*Uniform distribution: the loads are generally of an average or low unit power and spread throughout the surface area or over a large area of the building (uniform density).
 
:E.g.: lighting, individual workstations
*intermediate distribution: the loads are generally of medium power, placed in groups over the whole building surface area<br>E.g.: machines for assembly, conveying, workstations, modular logistics “sites”
*intermediate distribution: the loads are generally of medium power, placed in groups over the whole building surface area
 
:E.g.: machines for assembly, conveying, workstations, modular logistics “sites”
*localized loads: the loads are generally high power and localized in several areas of the building (non-uniform density).<br>E.g.: HVAC
*localized loads: the loads are generally high power and localized in several areas of the building (non-uniform density).
 
:E.g.: HVAC


== Voltage Interruption Sensitivity  ==
== Voltage Interruption Sensitivity  ==
Line 131: Line 122:


*“Sheddable” circuit: possible to shut down at any time for an indefinite duration  
*“Sheddable” circuit: possible to shut down at any time for an indefinite duration  
*Long interruption acceptable: interruption time &gt; 3 minutes <ref name="Ref4" />
*Long interruption acceptable: interruption time &gt; 3 minutes{{fn|4}}
*Short interruption acceptable: interruption time &lt; 3 minutes <ref name="Ref4" />  
*Short interruption acceptable: interruption time &lt; 3 minutes{{fn|4}}  
*No interruption acceptable.
*No interruption acceptable.


Line 143: Line 134:


This is expressed in terms of the criticality of supplying of loads or circuits.  
This is expressed in terms of the criticality of supplying of loads or circuits.  
*Non-critical:
*Non-critical:
 
:The load or the circuit can be “shed” at any time. E.g.: sanitary water heating circuit.  
The load or the circuit can be “shed” at any time. E.g.: sanitary water heating circuit.  
 
*Low criticality:
*Low criticality:
 
:A power interruption causes temporary discomfort for the occupants of a building, without any financial consequences. Prolonging of the interruption beyond the critical time can cause a loss of production or lower productivity. E.g.: heating, ventilation and air conditioning circuits (HVAC).  
A power interruption causes temporary discomfort for the occupants of a building, without any financial consequences. Prolonging of the interruption beyond the critical time can cause a loss of production or lower productivity. E.g.: heating, ventilation and air conditioning circuits (HVAC).  
 
*Medium criticality
*Medium criticality
 
:A power interruption causes a short break in process or service. Prolonging of the interruption beyond a critical time can cause a deterioration of the production facilities or a cost of starting for starting back up.
A power interruption causes a short break in process or service. Prolonging of the interruption beyond a critical time can cause a deterioration of the production facilities or a cost of starting for starting back up.<br>E.g.: refrigerated units, lifts.  
E.g.: refrigerated units, lifts.  
 
*High criticality
*High criticality
 
:Any power interruption causes mortal danger or unacceptable financial losses.  
Any power interruption causes mortal danger or unacceptable financial losses. <br>E.g.: operating theatre, IT department, security department.  
:E.g.: operating theatre, IT department, security department.  
 
{| class="wikitable"
|-
| * indicative value, supplied by standard EN50160: “Characteristics of the voltage supplied by public distribution networks”.
|}
 


== Disturbance sensitivity  ==
== Disturbance sensitivity  ==
Line 183: Line 162:
=== Different categories:  ===
=== Different categories:  ===


*low sensitivity: disturbances in supply voltages have very little effect on operations.<br>E.g.: heating device.  
*low sensitivity: disturbances in supply voltages have very little effect on operations.
*medium sensitivity: voltage disturbances cause a notable deterioration in operations.<br>E.g.: motors, lighting.  
:E.g.: heating device.  
*high sensitivity: voltage disturbances can cause operation stoppages or even the deterioration of the supplied equipment.<br>E.g.: IT equipment.
*medium sensitivity: voltage disturbances cause a notable deterioration in operations.
:E.g.: motors, lighting.  
*high sensitivity: voltage disturbances can cause operation stoppages or even the deterioration of the supplied equipment.
:E.g.: IT equipment.


The sensitivity of circuits to disturbances determines the design of shared or dedicated power circuits. Indeed it is better to separate “sensitive” loads from “disturbing” loads. E.g.: separating lighting circuits from motor supply circuits.This choice also depends on operating features. E.g.: separate power supply of lighting circuits to enable measurement of power consumption.  
The sensitivity of circuits to disturbances determines the design of shared or dedicated power circuits. Indeed it is better to separate “sensitive” loads from “disturbing” loads. E.g.: separating lighting circuits from motor supply circuits.This choice also depends on operating features. E.g.: separate power supply of lighting circuits to enable measurement of power consumption.  


== Disturbance potential of circuits  ==
== Disturbance potential of circuits  ==
Line 201: Line 182:
*moderate or occasional disturbance: separate power supply may be necessary in the presence of medium or high sensitivity circuits. E.g.: lighting circuit generating harmonic currents.  
*moderate or occasional disturbance: separate power supply may be necessary in the presence of medium or high sensitivity circuits. E.g.: lighting circuit generating harmonic currents.  
*Very disturbing: a dedicated power circuit or ways of attenuating disturbances are essential for the correct functioning of the installation. E.g.: electrical motor with a strong start-up current, welding equipment with fluctuating current.
*Very disturbing: a dedicated power circuit or ways of attenuating disturbances are essential for the correct functioning of the installation. E.g.: electrical motor with a strong start-up current, welding equipment with fluctuating current.


== Other considerations or constraints  ==
== Other considerations or constraints  ==


*Specific rules
*Specific rules
 
:E.g.: hospitals, high rise buildings, etc.  
E.g.: hospitals, high rise buildings, etc.  
 
*Rule of the Energy Distributor
*Rule of the Energy Distributor
 
:Example: limits of connection power for LV, access to MV substation, etc  
Example: limits of connection power for LV, access to MV substation, etc  
 
*Attachment loads
*Attachment loads
 
:Loads attached to 2 independent circuits for reasons of redundancy.  
Loads attached to 2 independent circuits for reasons of redundancy.  
 
*Designer experience
*Designer experience
 
:Consistency with previous designs or partial usage of previous designs, standardization of sub-assemblies, existence of an installed equipment base.  
Consistency with previous designs or partial usage of previous designs, standardization of sub-assemblies, existence of an installed equipment base.  
 
*Load power supply constraints
*Load power supply constraints
:Voltage level (230V, 400V, 690V), voltage system (single-phase, three-phase with or without neutral, etc)


Voltage level (230V, 400V, 690V), voltage system (single-phase, three-phase with or without neutral, etc)
{{footnotes}}
 
 
== Notes ==
<references>
<references>
<ref name="Ref1">Examples of commercial building: offices, retail, distribution, public buildings, banks, hotels.</ref>
{{fn-detail|1|Examples of commercial building: offices, retail, distribution, public buildings, banks, hotels.}}
<ref name="Ref2">Examples of industrial buildings: factories, workshops, distribution centers.</ref>
{{fn-detail|2|Examples of industrial buildings: factories, workshops, distribution centers.}}
<ref name="Ref3">Examples of infrastructure: airport, harbours, rails, transport facilites.</ref>
{{fn-detail|3|Examples of infrastructure: airport, harbours, rails, transport facilites.}}
<ref name="Ref4">indicative value, supplied by standard EN50160: “Characteristics of the voltage supplied by public distribution networks”.</ref>
{{fn-detail|4|indicative value, supplied by standard EN50160: “Characteristics of the voltage supplied by public distribution networks”.
</ref>
</references>
</references>


[[ru:Характеристики электроустановки]]
[[ru:Характеристики электроустановки]]
[[zh:电气装置的特性]]
[[zh:电气装置的特性]]

Revision as of 23:57, 20 November 2016

These are the main installation characteristics enabling the defining of the fundamentals and details of the electrical distribution architecture. For each of these characteristics, we supply a definition and the different categories or possible values.

Sectors of activities

Definition:

Among the definitions proposed by IEC60364-8-1 § 3.4, mainly those listed below are part of this chapter.

Residential buildings

  • Premises designed and constructed for private habitation

Commercial

  • Premises designed and constructed for commercial operations[1]

Industry

  • Premises designed and constructed for manufacturing and processing of operations[2]

Infrastructure

  • Systems or premises designed and constructed for the transport and utility operation[3]

Site topology

Definition:

Architectural characteristic of the building(s), taking account of the number of buildings, number of floors, and of the surface area of each floor.

Different categories:

  • Single storey building,
  • Multi-storey building,
  • Multi-building site,
  • High-rise building.

Layout latitude

Definition:

Characteristic taking account of constraints in terms of the layout of the electrical equipment in the building:

  • aesthetics,
  • accessibility,
  • presence of dedicated locations,
  • use of technical corridors (per floor),
  • use of technical ducts (vertical).

Different categories:

  • Low: the position of the electrical equipment is virtually imposed
  • Medium: the position of the electrical equipment is partially imposed, to the detriment of the criteria to be satisfied
  • High: no constraints.The position of the electrical equipment can be defined to best satisfy the criteria.

Service reliability

Definition:

The ability of a power system to meet its supply function under stated conditions for a specified period of time.

Different categories:

  • Minimum: this level of service reliability implies risk of interruptions related to constraints that are geographical (separate network, area distant from power production centers), technical (overhead line, poorly meshed system), or economic (insufficient maintenance, under-dimensioned generation).
  • Standard
  • Enhanced: this level of service reliability can be obtained by special measures taken to reduce the probability of interruption (underground network, strong meshing, etc.)

Maintainability

Definition:

Features input during design to limit the impact of maintenance actions on the operation of the whole or part of the installation.

Different categories:

  • Minimum: the installation must be stopped to carry out maintenance operations.
  • Standard: maintenance operations can be carried out during installation operations, but with deteriorated performance. These operations must be preferably scheduled during periods of low activity. Example: several transformers with partial redundancy and load shedding.
  • Enhanced: special measures are taken to allow maintenance operations without disturbing the installation operations. Example: double-ended configuration.

Installation flexibility

Definition:

Possibility of easily moving electricity delivery points within the installation, or to easily increase the power supplied at certain points. Flexibility is a criterion which also appears due to the uncertainty of the building during the pre-project summary stage.

Different categories:

  • No flexibility: the position of loads is fixed throughout the lifecycle, due to the high constraints related to the building construction or the high weight of the supplied process. E.g.: smelting works.
  • Flexibility of design: the number of delivery points, the power of loads or their location are not precisely known.
  • Implementation flexibility: the loads can be installed after the installation is commissioned.
  • Operating flexibility: the position of loads will fluctuate, according to process re-organization.
    • industrial building: extension, splitting and changing usage
    • office building: splitting

Power demand

Definition:

It's the maximum power and apparrent power demands actually required to dimension the installation (see chapter A section 4 for more information):

  • < 630kVA
  • from 630 to 1250kVA
  • from 1250 to 2500kVA
  • > 2500kVA

Load distribution

Definition:

A characteristic related to the uniformity of load distribution (in kVA / m2) over an area or throughout the building.

Different categories:

  • Uniform distribution: the loads are generally of an average or low unit power and spread throughout the surface area or over a large area of the building (uniform density).
E.g.: lighting, individual workstations
  • intermediate distribution: the loads are generally of medium power, placed in groups over the whole building surface area
E.g.: machines for assembly, conveying, workstations, modular logistics “sites”
  • localized loads: the loads are generally high power and localized in several areas of the building (non-uniform density).
E.g.: HVAC

Voltage Interruption Sensitivity

Definition:

The aptitude of a circuit to accept a power interruption.

Different categories:

  • “Sheddable” circuit: possible to shut down at any time for an indefinite duration
  • Long interruption acceptable: interruption time > 3 minutes[4]
  • Short interruption acceptable: interruption time < 3 minutes[4]
  • No interruption acceptable.

We can distinguish various levels of severity of an electrical power interruption, according to the possible consequences:

  • No notable consequence,
  • Loss of production,
  • Deterioration of the production facilities or loss of sensitive data,
  • Causing mortal danger.

This is expressed in terms of the criticality of supplying of loads or circuits.

  • Non-critical:
The load or the circuit can be “shed” at any time. E.g.: sanitary water heating circuit.
  • Low criticality:
A power interruption causes temporary discomfort for the occupants of a building, without any financial consequences. Prolonging of the interruption beyond the critical time can cause a loss of production or lower productivity. E.g.: heating, ventilation and air conditioning circuits (HVAC).
  • Medium criticality
A power interruption causes a short break in process or service. Prolonging of the interruption beyond a critical time can cause a deterioration of the production facilities or a cost of starting for starting back up.

E.g.: refrigerated units, lifts.

  • High criticality
Any power interruption causes mortal danger or unacceptable financial losses.
E.g.: operating theatre, IT department, security department.

Disturbance sensitivity

Definition

The ability of a circuit to work correctly in presence of an electrical power disturbance.

A disturbance can lead to varying degrees of malfunctioning. E.g.: stopping working, incorrect working, accelerated ageing, increase of losses, etc

Types of disturbances with an impact on circuit operations:

  • overvoltages
  • voltage harmonic distorsion,
  • voltage drop, voltage dip
  • voltage fluctuation,
  • voltage imbalance.

Different categories:

  • low sensitivity: disturbances in supply voltages have very little effect on operations.
E.g.: heating device.
  • medium sensitivity: voltage disturbances cause a notable deterioration in operations.
E.g.: motors, lighting.
  • high sensitivity: voltage disturbances can cause operation stoppages or even the deterioration of the supplied equipment.
E.g.: IT equipment.

The sensitivity of circuits to disturbances determines the design of shared or dedicated power circuits. Indeed it is better to separate “sensitive” loads from “disturbing” loads. E.g.: separating lighting circuits from motor supply circuits.This choice also depends on operating features. E.g.: separate power supply of lighting circuits to enable measurement of power consumption.

Disturbance potential of circuits

Definition

The ability of a circuit to disturb the operation of surrounding circuits due to phenomena such as: harmonics, in-rush current, imbalance, High Frequency currents, electromagnetic radiation, etc.

Different categories

  • Non disturbing: no specific precaution to take
  • moderate or occasional disturbance: separate power supply may be necessary in the presence of medium or high sensitivity circuits. E.g.: lighting circuit generating harmonic currents.
  • Very disturbing: a dedicated power circuit or ways of attenuating disturbances are essential for the correct functioning of the installation. E.g.: electrical motor with a strong start-up current, welding equipment with fluctuating current.

Other considerations or constraints

  • Specific rules
E.g.: hospitals, high rise buildings, etc.
  • Rule of the Energy Distributor
Example: limits of connection power for LV, access to MV substation, etc
  • Attachment loads
Loads attached to 2 independent circuits for reasons of redundancy.
  • Designer experience
Consistency with previous designs or partial usage of previous designs, standardization of sub-assemblies, existence of an installed equipment base.
  • Load power supply constraints
Voltage level (230V, 400V, 690V), voltage system (single-phase, three-phase with or without neutral, etc)

Notes

  1. ^ Examples of commercial building: offices, retail, distribution, public buildings, banks, hotels.
  2. ^ Examples of industrial buildings: factories, workshops, distribution centers.
  3. ^ Examples of infrastructure: airport, harbours, rails, transport facilites.
  4. ^ 1 2 Cite error: Invalid <ref> tag; no text was provided for refs named Ref4

ru:Характеристики электроустановки zh:电气装置的特性

Share