On-site work time

From Electrical Installation Guide
Revision as of 09:51, 5 December 2014 by Christian Collombet (talk | contribs) (Text modified (guide 2015))


Time for implementing the electrical equipment on the site.

Different levels of priority
  • Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs,
  • Special: the on-site work time must be minimized, without generating any significant excess cost,
  • Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,

ru:Длительность монтажа zh:现场工作时间

Share