Example: electrical installation in a printworks

From Electrical Installation Guide
Revision as of 13:10, 15 November 2013 by LMischler (talk | contribs) (cleaned up source: table format, etc ...)

Home > MV and LV architecture selection guide for buildings > Example: electrical installation in a printworks


Brief description

Printing of personalized mailshots intended for mail order sales.


Installation characteristics



Characteristic Category
Activity Mechanical
Site topology single storey building, 10000m² (8000m² dedicated to the process, 2000m² for ancillary areas)
Layout latitude High
Service reliability Standard
Maintainability Standard
Installation flexibility
  • No flexibility planned:
    - HVAC
    - Process utilities
    - Office power supply
  •   Possible flexibility:

   - finishing, putting in envelopes
   - special machines, installed at a later date 
   - rotary machines (uncertainty at the draft design stage) 

Power demand 3500kVA
Load distribution Intermediate distribution
Power interruptions
sensitivity  
  • Sheddable circuits:

   - offices (apart from PC power sockets)
   - air conditioning, office heating 
   - social premises
   - maintenance premises

  • long interruptions acceptable:

   - printing machines 
   - workshop HVAC (hygrometric control)
   - Finishing, envelope filling
   - Process utilities (compressor, recycling of cooled water)

  • No interruptions acceptable:

   - servers, office PCs

Disturbance sensitivity
  • Average sensitivity:
    - motors, lighting
  • High sensitivity:
    - IT

 No special precaution to be taken due to the connection to the EdF network
 (low level of disturbance)

Disturbance capability Non disturbing
Other constraints
  • Building with lightning classification: lightning surge arresters installed
  • Power supply by overhead single feeder line


Technological characteristics



 Criteria  Category
 Atmosphere, environment
  • IP: standard (no dust, no water protection)
  • IK: standard (use of technical pits, dedicated premises)
  • °C: standard (temperature regulation)
 Service index  211
 Offer availability by country  No problem (project carried out in France)
 Other criteria  Nothing particular


Architecture assessment criteria



 Criteria  Category
 On-site work time  Secondary
 Environmental impact  Minimal: compliance with European standard regulations
 Preventive maintenance costs  Standard
 Power supply availability  Level I

Step 1: Architecture fundamentals



 Choice  Main criteria Solution
Connection to network Isolated site single branch circuit
MV Circuits Layout + criticality single feeder
Number of transformers Power > 2500kVA 2 x 2000kVA
Number and distribution of 
substations
Surface area and power
distribution 
2 possible solutions: 1 substation or
2 substations 
  • if 1 substations: NO link between MLVS
  • if 2 substations: interconnected switchboards
MV Generator Site activity No

FigD29.jpg

Fig. D29: Two possible single-line diagrams


Step 2: Architecture details


“1 substation” solution

 Choice  Main criteria  Solution
Layout Atmospheric constraint  Dedicated premises
Centralized or decentralized 
layout
Uniform loads, distributed power, scalability possibilities


Non-uniform loads, direct link from MLVS
  • Decentralized with busbar trunking:

     - finishing sector, envelope filling

  • Centralized with cables:

     - special machines, rotary machines, HVAC,  process
       utilities, offices (2 switchboards), office air conditioning,
       social premises,maintenance

Presence of back-up
generator 
Criticality ≤ low Network availability:
standard
No back-up generator
Presence of UPS Criticality UPS unit for servers and office PCs
LV circuit configuration 2 transformers, possible partial
redundancy   
  • Two-pole, variant 2 ½ MLVS + NO link (reduction of the Isc by MLVS, no redundancy
  • process (≤ weak)
  • sheddable circuit for non-critical loads

FigD30.jpg

Fig. D30: Detailed single-line diagram (1 substation)


Choice of technological solutions:



 Choice  Main criteria  Solution
MV/LV substation Atmosphere, environment indoor (dedicated premises)
MV switchboard Offer availability by country SM6 (installation produced in France)
Transformers Atmosphere, environment cast resin transfo (avoids constraints related to oil)
LV switchboard Atmosphere, IS MLVS: Prisma + P 
Sub-distribution: Prisma +
Busbar trunking Installed power to be supplied  Canalis KS
UPS units Installed power to be supplied, back- up time Galaxy PW
Power factor correction  Installed power, presence of harmonics LV, standard, automatic (Average Q, ease of installation)

“2 substation” solution

Ditto apart from:
LV circuit: 2 remote MLVS connected via busbar trunking


FigD31.jpg

Fig. D31: Detailed single-line diagram (2 substations)

ru:Пример: электроснабжение типографии zh:举例:印刷厂的电气装置

Share