On-site work time
From Electrical Installation Guide
Time for implementing the electrical equipment on the site.
Different levels of priority
- Secondary: the on-site work time can be extended, if this gives a reduction in overall installation costs,
- Special: the on-site work time must be minimized, without generating any significant excess cost,
- Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,