Time for implementing the electrical equipment on the site.  
Time for implementing the electrical equipment on the site.  


===== Different levels of priority  =====
== Different levels of priority  ==


* Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs,
* Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs,

Revision as of 04:45, 9 December 2014


Time for implementing the electrical equipment on the site.

Different levels of priority

  • Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs,
  • Special: the on-site work time must be minimized, without generating any significant excess cost,
  • Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,