The possible solutions for the connection of an installation to the utility network are the following:
The possible solutions for the connection of an installation to the utility network are the following:
* Connection to the LV network for small and medium size installations requiring less than 400 kVA. Fixing this limit is always under the responsibility of the local utility managing the LV network
* Connection to the LV network for small and medium size installations requiring less than 400 kVA. Fixing this limit is always under the responsibility of the local utility managing the LV network
* Above this previous limit, connection to the MV network with either LV or MV metering. LV metering is generally authorized for installation including a single MV/LV transformer not exceeding the rated power limit fixed by the utility, generally around 1250 kVA. <br> The possible connections to a MV utility network are the following, (see '''Fig. D8, D9 and D10'''):
* Above this previous limit, connection to the MV network with either LV or MV metering. LV metering is generally authorized for installation including a single MV/LV transformer not exceeding the rated power limit fixed by the utility, generally around 1250 kVA.  
** MV single-line service,<br>
: The possible connections to a MV utility network are the following, (see {{FigureRef|D8|D9|D10}}):
** MV ring-main service,<br>
:* MV single-line service,
** MV duplicate supply service, including two load break switches equipped with an automatic change over,<br>
:* MV ring-main service,
** MV dual supply service with two independent connections to the utility and two bus bars connected with a bus tie. The two utility incomers and the bus tie are equipped with an automatic change over.
:* MV duplicate supply service, including two load break switches equipped with an automatic change over,
:* MV dual supply service with two independent connections to the utility and two bus bars connected with a bus tie. The two utility incomers and the bus tie are equipped with an automatic change over.


Comparison of this four modes of connection are summarized in {{FigRef|D7}}
Comparison of this four modes of connection are summarized in {{FigRef|D7}}


{| class="wikitable"
{{TableStart|Tab1083|5col}}
|-
|-
! rowspan="2" |
! rowspan="2" |
Line 19: Line 20:
! colspan="4" | MV
! colspan="4" | MV
|-
|-
! Characteristic to <br>consider  
! Characteristic to consider  
!  
!  
! Single-line  
! Single-line  
Line 48: Line 49:
|-
|-
| Power demand  
| Power demand  
| &lt; 400 kVA  
| < 400 kVA  
| ≤ 1250kVA  
| ≤ 1250kVA  
| Any  
| Any  
Line 60: Line 61:
| High density urban area  
| High density urban area  
| Dedicated measures taken by the utility
| Dedicated measures taken by the utility
|}
|-
 
{{TableEnd|Tab1083|D7|Comparison of the modes of connection}}
'''''Fig. D7:''''' ''Comparison of the modes of connection''
 
 
[[File:DB422124_EN.svg|none]]
 
 
'''''Fig. D8:''''' ''MV connection with LV metering''
 
 
[[File:DB422125_EN.svg|none]]
 
 
'''''Fig. D9:''''' ''MV connection with MV metering''
 


[[File:DB422126_EN.svg|none]]
{{FigImage|DB422124_EN|svg|D8|MV connection with LV metering}}


{{FigImage|DB422125_EN|svg|D9|MV connection with MV metering}}


'''''Fig. D10:''''' ''Dual MV connection with MV metering''
{{FigImage|DB422126_EN|svg|D10|Dual MV connection with MV metering}}


[[ru:Подключение к питающей сети]]
[[ru:Подключение к питающей сети]]
[[zh:与上级网络的连接]]
[[zh:与上级网络的连接]]

Revision as of 01:08, 21 November 2016


The possible solutions for the connection of an installation to the utility network are the following:

  • Connection to the LV network for small and medium size installations requiring less than 400 kVA. Fixing this limit is always under the responsibility of the local utility managing the LV network
  • Above this previous limit, connection to the MV network with either LV or MV metering. LV metering is generally authorized for installation including a single MV/LV transformer not exceeding the rated power limit fixed by the utility, generally around 1250 kVA.
The possible connections to a MV utility network are the following, (see Figure D8, D9 and D10):
  • MV single-line service,
  • MV ring-main service,
  • MV duplicate supply service, including two load break switches equipped with an automatic change over,
  • MV dual supply service with two independent connections to the utility and two bus bars connected with a bus tie. The two utility incomers and the bus tie are equipped with an automatic change over.

Comparison of this four modes of connection are summarized in Fig. D7

Configuration
LV MV
Characteristic to consider Single-line Ring-main Duplicate supply Dual supply
Activity Any Any Any High tech, sensitive office, health-care Very sensitive installations
Site topology Single building Single building Single or several buildings Single or several buildings Single or several buildings
Service reliability Minimal Minimal Standard Enhanced Very high
Power demand < 400 kVA ≤ 1250kVA Any Any Any
Other connection constraints Any Isolated site Low density urban area High density urban area Dedicated measures taken by the utility
Fig. D7 – Comparison of the modes of connection
Fig. D8 – MV connection with LV metering
Fig. D9 – MV connection with MV metering
Fig. D10 – Dual MV connection with MV metering

ru:Подключение к питающей сети zh:与上级网络的连接