Talk:Designing a metering system/Archive 1: Difference between revisions
(creation) |
(Wikitext talk to Structured Discussions conversion) |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Archive for converted wikitext talk page|from=Talk:Designing a metering system|date=2019-12-18}} | |||
I wrote this content as a guide for people who design energy metering system for commercial buildings. | I wrote this content as a guide for people who design energy metering system for commercial buildings. | ||
The chapter "select the meters" will be completed in a near future | |||
Don't take it as fully finalized, and don't hesitate to complete or correct mistakes if any | Don't take it as fully finalized, and don't hesitate to complete or correct mistakes if any |
Latest revision as of 13:23, 18 December 2019
This page is an archive. Do not edit the contents of this page. Please direct any additional comments to the current talk page.
I wrote this content as a guide for people who design energy metering system for commercial buildings. The chapter "select the meters" will be completed in a near future
Don't take it as fully finalized, and don't hesitate to complete or correct mistakes if any
Tell me also in this discussion page if you think it is useful --Jean-paul genet 14:38, 15 June 2010 (UTC)