Choice of architecture fundamentals: Difference between revisions
From Electrical Installation Guide
CleanUp2016 (talk | contribs) (Cleanup_2016) |
Migrate2019 (talk | contribs) (converted syntax for Manual Tocs) |
||
Line 10: | Line 10: | ||
* The second stage deals with the principle of supply of the LV consumers | * The second stage deals with the principle of supply of the LV consumers | ||
{{ | {{Section-TOC}} | ||
}} | |||
[[ru:Выбор основных элементов архитектуры]] | [[ru:Выбор основных элементов архитектуры]] | ||
[[zh:系统基本条件的选择]] | [[zh:系统基本条件的选择]] |
Revision as of 13:59, 20 December 2019
For the installations considered in this guide, the selection of an electrical architecture can be performed in two stages.
- The first stage is generally dedicated to:
- The selection of the mode of connection of the installation to the utility network,
- The choice of the internal MV distribution including:
- The definition of the number of MV/LV substations,
- The definition of the number of MV/LV transformers,
- The definition of the MV back-up generator when needed.
- The second stage deals with the principle of supply of the LV consumers