Choice of architecture details: Difference between revisions
From Electrical Installation Guide
m (1 revision imported: Migrated pages - manual tocs) |
Migrate2019 (talk | contribs) (removed empty lines at the beginning of wiki pages) |
||
Line 1: | Line 1: | ||
{{Menu_MV_and_LV_architecture_selection_guide}} | {{Menu_MV_and_LV_architecture_selection_guide}} | ||
This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices: | This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices: | ||
* Layout, | * Layout, |
Revision as of 17:33, 20 December 2019
This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices:
- Layout,
- Centralized or decentralized distribution,
- Presence of back-up generators,
- Presence of uninterruptible power supplies,
- Configuration of LV distribution,
- Architecture combinations.