Choice of architecture details: Difference between revisions
From Electrical Installation Guide
m (cleaned up source: table format, etc ...) |
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "") |
||
(13 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
{{Menu_MV_and_LV_architecture_selection_guide}} This is the second stage in designing of | {{Menu_MV_and_LV_architecture_selection_guide}} | ||
This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices: | |||
* Layout, | |||
* Centralized or decentralized distribution, | |||
* Presence of back-up generators, | |||
* Presence of uninterruptible power supplies, | |||
* Configuration of LV distribution, | |||
* Architecture combinations. | |||
{{Section-TOC}} | |||
{{ | |||
}} | |||
Latest revision as of 09:48, 22 June 2022
This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices:
- Layout,
- Centralized or decentralized distribution,
- Presence of back-up generators,
- Presence of uninterruptible power supplies,
- Configuration of LV distribution,
- Architecture combinations.