Internal MV circuits are dedicated to the supply of the secondary MV/LV substations dispersed in the installation. They are three typical principles commonly used for this purpose {{FigRef|D11}}: | |||
* Single feeder | |||
* Dual feeder | |||
* Open ring | |||
{{FigImage|DB422127_EN|svg|D11|Single feeder, Dual feeder, Open ring}} | |||
Comparison of these three typical principles of internal distribution is given {{FigRef|D12}}. | |||
- | {{tb-start|id=Tab1084|num=D12|title=Comparison of the typical internal circuits|cols=3}} | ||
{| class="wikitable" | |||
{| | |||
|- | |- | ||
| | | | ||
! colspan="3" | MV circuit configuration | |||
|- | |- | ||
! Characteristic to consider | |||
! Single feeder | |||
! Open ring | |||
! Dual feeder | |||
|- | |- | ||
| Site topology | |||
| Any | |||
| | | Single or several buildings | ||
| | | Single or several buildings | ||
|- | |- | ||
| Power demand | | Power demand | ||
| Any | | Any | ||
| | | > 1250kVA | ||
| | | > 2500kVA | ||
|- | |- | ||
| Disturbance sensitivity | | Disturbance sensitivity | ||
| Long interruption acceptable | | Long interruption acceptable | ||
| Short interruption acceptable | | Short interruption acceptable | ||
| Short interruption acceptable | | Short interruption not acceptable | ||
|} | |} | ||
Latest revision as of 09:48, 22 June 2022
Internal MV circuits are dedicated to the supply of the secondary MV/LV substations dispersed in the installation. They are three typical principles commonly used for this purpose Fig. D11:
- Single feeder
- Dual feeder
- Open ring
Comparison of these three typical principles of internal distribution is given Fig. D12.
Fig. D12 – Comparison of the typical internal circuits
MV circuit configuration | |||
---|---|---|---|
Characteristic to consider | Single feeder | Open ring | Dual feeder |
Site topology | Any | Single or several buildings | Single or several buildings |
Power demand | Any | > 1250kVA | > 2500kVA |
Disturbance sensitivity | Long interruption acceptable | Short interruption acceptable | Short interruption not acceptable |