Installed power loads - Characteristics: Difference between revisions

From Electrical Installation Guide
Home > General rules of electrical installation design > Installed power loads - Characteristics
m (1 revision: no page modification, previous revision = imported ch.A pages cleaned-up)
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "")
 
(7 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Menu_General_rules_of_electrical_installation_design}} <br>
{{Menu_General_rules_of_electrical_installation_design}}
 
{{Highlightbox|
{{Highlightbox|
An examination of the actual apparent-power demands of different loads: a necessary preliminary step in the design of a LV installation
An examination of the actual apparent-power demands of different loads: a necessary preliminary step in the design of a LV installation
}}
}}


The examination of actual values of apparent-power required by each load enables the establishment of:  
The examination of actual values of apparent-power required by each load enables the establishment of:  
*A declared power demand which determines the contract for the supply of energy  
*A declared power demand which determines the contract for the supply of energy  
*The rating of the MV/LV transformer, where applicable (allowing for expected increased load)  
*The rating of the MV/LV transformer, where applicable (allowing for expected increased load)  
*Levels of load current at each distribution board<br><br>
*Levels of load current at each distribution board
 
{{Manual_TOC |
* [[Induction motors]]
* [[Resistive-type heating appliances and incandescent lamps (conventional or halogen)]]
* [[Fluorescent lamps]]
* [[Discharge lamps]]
* [[LED lamps & fixtures]]
}}


[[ru:Установленные мощности потребителей - характеристики]]
{{Section-TOC}}
[[zh:安装电力负荷 — 特性]]

Latest revision as of 09:48, 22 June 2022

An examination of the actual apparent-power demands of different loads: a necessary preliminary step in the design of a LV installation

The examination of actual values of apparent-power required by each load enables the establishment of:

  • A declared power demand which determines the contract for the supply of energy
  • The rating of the MV/LV transformer, where applicable (allowing for expected increased load)
  • Levels of load current at each distribution board
Share