Choice of architecture fundamentals: Difference between revisions

From Electrical Installation Guide
Home > MV and LV architecture selection guide for buildings > Choice of architecture fundamentals
(removed empty lines at the beginning of wiki pages)
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "")
 
(3 intermediate revisions by 2 users not shown)
Line 10: Line 10:


{{Section-TOC}}
{{Section-TOC}}
[[ru:Выбор основных элементов архитектуры]]
[[zh:系统基本条件的选择]]

Latest revision as of 09:49, 22 June 2022

For the installations considered in this guide, the selection of an electrical architecture can be performed in two stages.

  • The first stage is generally dedicated to:
    • The selection of the mode of connection of the installation to the utility network,
    • The choice of the internal MV distribution including:
      • The definition of the number of MV/LV substations,
      • The definition of the number of MV/LV transformers,
      • The definition of the MV back-up generator when needed.
  • The second stage deals with the principle of supply of the LV consumers
Share