Time for implementing the electrical equipment on the site.
 
===== Different levels of priority =====
 
*Secondary: the on-site work time can be extended, if this gives a reduction in overall installation costs,
*Special: the on-site work time must be minimized, without generating any significant excess cost,
*Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,<br>
 