The method to optimize harmonics mitigation: Difference between revisions

From Electrical Installation Guide
Home > Power harmonics management > Solutions to mitigate harmonics > The method to optimize harmonics mitigation
m (moved The method to attenuate harmonics to The method to optimize harmonics mitigation: page name changed according to guide 2013)
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "")
 
(11 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Menu_Harmonic_management}}
{{Menu_Harmonic_management}}__NOTOC__
__TOC__
The best solution, in both technical and financial terms, is based on the results of an in-depth study.


{| style="width: 793px; height: 28px" cellspacing="1" cellpadding="1" width="793" border="1"
== Harmonic audit of MV and LV networks ==
|-
| bgcolor="#0099cc" | A complete set of services can be offered to eliminate harmonics:
*Installation analysis
*Measurement and monitoring systems
*Filtering solutions


|}
By calling on an expert, you are guaranteed that the proposed solution will produce effective results (e.g. a guaranteed maximum THD<sub>u</sub>).


The best solution, in both technical and financial terms, is based on the results of an in-depth study.<br>Harmonic audit of MV and LV networks<br>By calling on an expert, you are guaranteed that the proposed solution will produce effective results (e.g. a guaranteed maximum THDu).<br>A harmonic audit is carried out by an engineer specialised in the disturbances affecting electrical distribution networks and equipped with powerful analysis and simulation equipment and software.<br>The steps in an audit are the following:
A harmonic audit is carried out by an engineer specialised in the disturbances affecting electrical distribution networks and equipped with powerful analysis and simulation equipment and software.


The steps in an audit are the following:
*Measurement of disturbances affecting current and phase-to-phase and phase-to-neutral voltages at the supply source, the disturbed outgoing circuits and the non-linear loads  
*Measurement of disturbances affecting current and phase-to-phase and phase-to-neutral voltages at the supply source, the disturbed outgoing circuits and the non-linear loads  
*Computer modelling of the phenomena to obtain a precise explanation of the causes and determine the best solutions  
*Computer modelling of the phenomena to obtain a precise explanation of the causes and determine the best solutions  
*A complete audit report presenting:
*A complete audit report presenting:
 
** The current levels of disturbances
&nbsp; - The current levels of disturbances<br>&nbsp; - The maximum permissible levels of disturbances (IEC 61000, IEC 34, etc.)  
** The maximum permissible levels of disturbances (refer to IEC 61000, IEEE 519, etc.)  
 
*A proposal containing solutions with guaranteed levels of performance  
*A proposal containing solutions with guaranteed levels of performance  
*Finally, implementation of the selected solution, using the necessary means and resources.
*Finally, implementation of the selected solution, using the necessary means and resources.


The entire audit process is certified ISO 9002.  
The entire audit process should be certified ISO 9002.
 
<br>
 
[[ru:Метод ослабления гармоник]]
[[zh:抑制谐波的过程]]

Latest revision as of 07:31, 4 August 2022

The best solution, in both technical and financial terms, is based on the results of an in-depth study.

Harmonic audit of MV and LV networks

By calling on an expert, you are guaranteed that the proposed solution will produce effective results (e.g. a guaranteed maximum THDu).

A harmonic audit is carried out by an engineer specialised in the disturbances affecting electrical distribution networks and equipped with powerful analysis and simulation equipment and software.

The steps in an audit are the following:

  • Measurement of disturbances affecting current and phase-to-phase and phase-to-neutral voltages at the supply source, the disturbed outgoing circuits and the non-linear loads
  • Computer modelling of the phenomena to obtain a precise explanation of the causes and determine the best solutions
  • A complete audit report presenting:
    • The current levels of disturbances
    • The maximum permissible levels of disturbances (refer to IEC 61000, IEEE 519, etc.)
  • A proposal containing solutions with guaranteed levels of performance
  • Finally, implementation of the selected solution, using the necessary means and resources.

The entire audit process should be certified ISO 9002.

Share