Choice of architecture fundamentals: Difference between revisions
From Electrical Installation Guide
m (cleaned up source: table format, etc ...) |
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "") |
||
(11 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{Menu_MV_and_LV_architecture_selection_guide}} | {{Menu_MV_and_LV_architecture_selection_guide}} | ||
For the installations considered in this guide, the selection of an electrical architecture can be performed in two stages. | |||
* The first stage is generally dedicated to: | |||
** The selection of the mode of connection of the installation to the utility network, | |||
** The choice of the internal MV distribution including: | |||
***The definition of the number of MV/LV substations, | |||
***The definition of the number of MV/LV transformers, | |||
***The definition of the MV back-up generator when needed. | |||
* The second stage deals with the principle of supply of the LV consumers | |||
{{Section-TOC}} | |||
{{ | |||
}} | |||
Latest revision as of 09:49, 22 June 2022
For the installations considered in this guide, the selection of an electrical architecture can be performed in two stages.
- The first stage is generally dedicated to:
- The selection of the mode of connection of the installation to the utility network,
- The choice of the internal MV distribution including:
- The definition of the number of MV/LV substations,
- The definition of the number of MV/LV transformers,
- The definition of the MV back-up generator when needed.
- The second stage deals with the principle of supply of the LV consumers