Connection to the utility network: Difference between revisions
From Electrical Installation Guide
*>CleanUpAuto (clean-up 2016 - imported revision step 20) |
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "") |
||
(10 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Menu_MV_and_LV_architecture_selection_guide}} | {{Menu_MV_and_LV_architecture_selection_guide}} | ||
The possible solutions for the connection of an installation to the utility network are the following: | The possible solutions for the connection of an installation to the utility network are the following: | ||
* Connection to the LV network for small and medium size installations requiring less than 400 kVA. Fixing this limit is always under the responsibility of the local utility managing the LV network | * Connection to the LV network for small and medium size installations requiring less than 400 kVA. Fixing this limit is always under the responsibility of the local utility managing the LV network | ||
* Above this previous limit, connection to the MV network with either LV or MV metering. LV metering is generally authorized for installation including a single MV/LV transformer not exceeding the rated power limit fixed by the utility, generally around 1250 kVA. | * Above this previous limit, connection to the MV network with either LV or MV metering. LV metering is generally authorized for installation including a single MV/LV transformer not exceeding the rated power limit fixed by the utility, generally around 1250 kVA. | ||
: The possible connections to a MV utility network are the following, (see {{FigureRef|D8|D9|D10}}): | |||
:* MV single-line service, | |||
:* MV ring-main service, | |||
:* MV duplicate supply service, including two load break switches equipped with an automatic change over, | |||
:* MV dual supply service with two independent connections to the utility and two bus bars connected with a bus tie. The two utility incomers and the bus tie are equipped with an automatic change over. | |||
Comparison of this four modes of connection are summarized in {{FigRef|D7}} | Comparison of this four modes of connection are summarized in {{FigRef|D7}} | ||
{{tb-start|id=Tab1083|num=D7|title=Comparison of the modes of connection|cols=5}} | |||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! rowspan=" | ! rowspan="3" | Characteristic to consider | ||
! colspan="5" | Configuration | ! colspan="5" | Configuration | ||
|- | |- | ||
! LV | ! rowspan="2" | LV | ||
! colspan="4" | MV | ! colspan="4" | MV | ||
|- | |- | ||
! Single-line | ! Single-line | ||
! Ring-main | ! Ring-main | ||
Line 48: | Line 47: | ||
|- | |- | ||
| Power demand | | Power demand | ||
| | | < 400 kVA | ||
| ≤ 1250kVA | | ≤ 1250kVA | ||
| Any | | Any | ||
Line 62: | Line 61: | ||
|} | |} | ||
{{FigImage|DB422124_EN|svg|D8|MV connection with LV metering}} | |||
{{FigImage|DB422125_EN|svg|D9|MV connection with MV metering}} | |||
{{FigImage|DB422126_EN|svg|D10|Dual MV connection with MV metering}} | |||
Latest revision as of 09:49, 22 June 2022
The possible solutions for the connection of an installation to the utility network are the following:
- Connection to the LV network for small and medium size installations requiring less than 400 kVA. Fixing this limit is always under the responsibility of the local utility managing the LV network
- Above this previous limit, connection to the MV network with either LV or MV metering. LV metering is generally authorized for installation including a single MV/LV transformer not exceeding the rated power limit fixed by the utility, generally around 1250 kVA.
- The possible connections to a MV utility network are the following, (see Figure D8, D9 and D10):
- MV single-line service,
- MV ring-main service,
- MV duplicate supply service, including two load break switches equipped with an automatic change over,
- MV dual supply service with two independent connections to the utility and two bus bars connected with a bus tie. The two utility incomers and the bus tie are equipped with an automatic change over.
Comparison of this four modes of connection are summarized in Fig. D7
Fig. D7 – Comparison of the modes of connection
Characteristic to consider | Configuration | ||||
---|---|---|---|---|---|
LV | MV | ||||
Single-line | Ring-main | Duplicate supply | Dual supply | ||
Activity | Any | Any | Any | High tech, sensitive office, health-care | Very sensitive installations |
Site topology | Single building | Single building | Single or several buildings | Single or several buildings | Single or several buildings |
Service reliability | Minimal | Minimal | Standard | Enhanced | Very high |
Power demand | < 400 kVA | ≤ 1250kVA | Any | Any | Any |
Other connection constraints | Any | Isolated site | Low density urban area | High density urban area | Dedicated measures taken by the utility |