Choice of architecture details: Difference between revisions
From Electrical Installation Guide
Migrate2019 (talk | contribs) (converted syntax for Manual Tocs) |
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "") |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Menu_MV_and_LV_architecture_selection_guide}} | {{Menu_MV_and_LV_architecture_selection_guide}} | ||
This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices: | This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices: | ||
* Layout, | * Layout, | ||
Line 10: | Line 9: | ||
{{Section-TOC}} | {{Section-TOC}} | ||
Latest revision as of 09:48, 22 June 2022
This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices:
- Layout,
- Centralized or decentralized distribution,
- Presence of back-up generators,
- Presence of uninterruptible power supplies,
- Configuration of LV distribution,
- Architecture combinations.