Internal MV circuits are dedicated to the supply of the secondary MV/LV substations dispersed in the installation. They are three typical principles commonly used for this purpose {{FigRef|D11}}: | Internal MV circuits are dedicated to the supply of the secondary MV/LV substations dispersed in the installation. They are three typical principles commonly used for this purpose {{FigRef|D11}}: | ||
* Single feeder | * Single feeder | ||
Line 36: | Line 35: | ||
| Short interruption not acceptable | | Short interruption not acceptable | ||
|} | |} | ||
Latest revision as of 09:48, 22 June 2022
Internal MV circuits are dedicated to the supply of the secondary MV/LV substations dispersed in the installation. They are three typical principles commonly used for this purpose Fig. D11:
- Single feeder
- Dual feeder
- Open ring
Comparison of these three typical principles of internal distribution is given Fig. D12.
Fig. D12 – Comparison of the typical internal circuits
MV circuit configuration | |||
---|---|---|---|
Characteristic to consider | Single feeder | Open ring | Dual feeder |
Site topology | Any | Single or several buildings | Single or several buildings |
Power demand | Any | > 1250kVA | > 2500kVA |
Disturbance sensitivity | Long interruption acceptable | Short interruption acceptable | Short interruption not acceptable |