Choice of architecture details: Difference between revisions
From Electrical Installation Guide
Migrate2019 (talk | contribs) (removed links to Chinese wiki) |
m (Text replacement - "\[\[ru:[^]]*\]\][ \r\n]*" to "") |
||
(One intermediate revision by the same user not shown) | |||
Line 9: | Line 9: | ||
{{Section-TOC}} | {{Section-TOC}} | ||
Latest revision as of 09:48, 22 June 2022
This is the second stage in designing of electrical distribution design. During this stage we carry out the following choices:
- Layout,
- Centralized or decentralized distribution,
- Presence of back-up generators,
- Presence of uninterruptible power supplies,
- Configuration of LV distribution,
- Architecture combinations.