Diversity factor: Difference between revisions

From Electrical Installation Guide
No edit summary
(modified redirection to point more precisely to the right paragraph in the page (guide 2015))
 
(7 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Menu_General_rules_of_electrical_installation_design}}
#REDIRECT [[Estimation of actual maximum kVA demand#Diversity factor - Coincidence factor (ks)]]
<br>
The term diversity factor, as defined in IEC&nbsp;standards, is identical to the factor of simultaneity (ks) used in this guide.In some English-speaking countries however (at the time of writing) diversity factor is the inverse of ks i.e. it&nbsp;is always ≥ 1. <br>
 
----
 
<br>
 
[[Image:Fig-A14.jpg]]
 
'''''Fig A14:'''''<i>&nbsp;An example in estimating the maximum predicted loading of an installation (the factor values used are for demonstration purposes only)</i> <br>
 
----

Latest revision as of 08:31, 25 November 2014

Share