Time for implementing the electrical equipment on the site.  
Time for implementing the electrical equipment on the site.  

Revision as of 13:10, 15 November 2013


Time for implementing the electrical equipment on the site.

Different levels of priority
  • Secondary: the on-site work time can be extended, if this gives a reduction in overall installation costs,
  • Special: the on-site work time must be minimized, without generating any significant excess cost,
  • Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,