On-site work time: Difference between revisions
From Electrical Installation Guide
(Text modified (guide 2015)) |
(Heading style corrected) |
||
Line 1: | Line 1: | ||
{{Menu_MV_and_LV_architecture_selection_guide}} | {{Menu_MV_and_LV_architecture_selection_guide}} | ||
Time for implementing the electrical equipment on the site. | Time for implementing the electrical equipment on the site. | ||
== Different levels of priority == | |||
* Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs, | * Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs, |
Revision as of 04:45, 9 December 2014
Time for implementing the electrical equipment on the site.
Different levels of priority
- Standard: the on-site work time can be extended, if this gives a reduction in overall installation costs,
- Special: the on-site work time must be minimized, without generating any significant excess cost,
- Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,