|
|
Line 1: |
Line 1: |
| {{Menu_Protection_against_electric_shocks}} | | {{Menu_Protection_against_electric_shocks}} |
|
| |
| The basic feature of the IT earthing system is that, in the event of a short-circuit to earth fault, the system can continue to operate without interruption. Such a fault is referred to as a “first fault”.
| |
|
| |
| In this system, all exposed conductive parts of an installation are connected via PE conductors to an earth electrode at the installation, while the neutral point of the supply transformer is:
| |
| *Either isolated from earth
| |
| *Or connected to earth through a high resistance (commonly 1,000 ohms or more)
| |
|
| |
| This means that the current through an earth fault will be measured in milli-amps, which will not cause serious damage at the fault position, or give rise to dangerous touch voltages, or present a fire hazard. The system may therefore be allowed to operate normally until it is convenient to isolate the faulty section for repair work. This enhances continuity of service.
| |
|
| |
| In practice, the system earthing requires certain specific measures for its satisfactory exploitation:
| |
| *Permanent monitoring of the insulation with respect to earth, which must signal (audibly or visually) the occurrence of the first fault
| |
| *A device for limiting the voltage which the neutral point of the supply transformer can reach with respect to earth
| |
| *A “first-fault” location routine by an efficient maintenance staff. Fault location is greatly facilitated by automatic devices which are currently available
| |
| *Automatic high-speed tripping of appropriate circuit-breakers must take place in the event of a “second fault” occurring before the first fault is repaired. The second fault (by definition) is an earth fault affecting a different live conductor than that of the first fault (can be a phase or neutral conductor){{fn|1}}.
| |
|
| |
| The second fault results in a short-circuit through the earth and/or through PE bonding conductors.
| |
|
| |
|
| {{Manual_TOC | | | {{Manual_TOC | |
| * [[IT system - Preliminary conditions]] | | * [[IT system - Principle|Principle]] |
| * [[IT system - Protection against indirect contact]] | | * [[IT system - Fault protection|Fault protection]] |
| * [[IT system - High-sensitivity RCDs]] | | * [[IT system - Implementation of protections|Implementation of protections]] |
| * [[IT system - Protection in high fire-risk locations]] | | * [[IT system - Practical aspects|Practical aspects]] |
| * [[IT system - When the fault current-loop impedance is particularly high]]}}
| | }} |
|
| |
|
| {{footnotes}}
| |
| <references>
| |
| {{fn-detail|1|On systems where the neutral is distributed, as shown in Figure F56.}}
| |
| </references>
| |
|
| |
|
| [[ru:Реализация системы IT]] | | [[fr:Protection contre les chocs et incendies électriques]] |
| [[zh:IT 系统的应用]] | | [[de:Schutz gegen elektrischen Schlag]] |
| | [[ru:Защита от поражения электрическим током]] |
| | [[zh:电击防护]] |