LV Distribution: Difference between revisions

From Electrical Installation Guide
No edit summary
No edit summary
Line 1: Line 1:
{{Menu Index}}
{{Menu Index}} __NOTOC__  
__NOTOC__  


== [[Stakes for the user|Stakes for the user]] ==
== [[Earthing schemes|Earthing schemes]] ==


== [[Simplified architecture design process|Simplified architecture design process]] ==
==== Earthing connections ====


==== The architecture design  ====
==== Definition of standardised earthing schemes ====


==== The whole process ====
==== Characteristics of TT, TN and IT systems ====


== [[Electrical installation characteristics|Electrical installation characteristics]] ==
==== Selection criteria for the TT, TN and IT systems ====


==== Activity ====
==== Choice of earthing method - implementation ====


==== Site topology  ====
==== Installation and measurements of earth electrodes ====


==== Layout latitude  ====
== [[The installation system|The installation system]] ==


==== Service reliability ====
==== Distribution switchboards ====


==== Maintainability ====
==== Cables and busways ====


==== Installation flexibility  ====
== [[External influences (IEC 60364-5-51) |External influences (IEC 60364-5-51)]] ==


==== Power demand ====
==== Definition and reference standards ====


==== Load distribution ====
==== Classification ====


==== Power interruption sensitivity ====
==== List of external influences ====


==== Disturbance sensitivity  ====
==== Protection provided for enclosed equipment: codes IP and IK ====
 
==== Disturbance capability of circuits   ====
 
==== Other considerations or constraints  ====
 
== [[Technological characteristics|Technological characteristics]]  ==
 
==== Environment, atmosphere  ====
 
==== Service Index  ====
 
==== Other considerations  ====
 
== [[Architecture assessment criteria|Architecture assessment criteria]]  ==
 
==== On-site work time  ====
 
==== Environmental impact  ====
 
==== Preventive maintenance level  ====
 
==== Availability of electrical power supply  ====
 
== [[Choice of architecture fundamentals|Choice of architecture fundamentals]]  ==
 
==== Connection to the upstream network  ====
 
==== MV circuit configuration  ====
 
==== Number and distribution of MV/LV transformation substations  ====
 
==== Number of MV/LV transformers  ====
 
==== MV back-up generator  ====
 
== [[Choice of architecture details|Choice of architecture details]]  ==
 
==== Layout  ====
 
==== Centralized or distributed layout  ====
 
==== Presence of an Uninterruptible Power Supply (UPS)  ====
 
==== Configuration of LV circuits  ====
 
== [[Choice of equiment|Choice of equiment]]  ==
 
== [[Recommendations for architecture optimization|Recommendations for architecture optimization]]  ==
 
==== On-site work time  ====
 
==== Environmental impact  ====
 
==== Preventive maintenance volume  ====
 
==== Electrical power availability  ====
 
== [[Glossary|Glossary]]  ==
 
== [[ID-Spec software|ID-Spec software]]  ==
 
== [[Example: electrical installation in a printworks|Example: electrical installation in a printworks]]  ==
 
==== Brief description  ====
 
==== Installation characteristics  ====
 
==== Technological characteristics  ====
 
==== Architecture assessment criteria  ====
 
==== Choice of technogical solutions ====

Revision as of 04:55, 3 February 2010

Template:Menu Index

Earthing schemes

Earthing connections

Definition of standardised earthing schemes

Characteristics of TT, TN and IT systems

Selection criteria for the TT, TN and IT systems

Choice of earthing method - implementation

Installation and measurements of earth electrodes

The installation system

Distribution switchboards

Cables and busways

External influences (IEC 60364-5-51)

Definition and reference standards

Classification

List of external influences

Protection provided for enclosed equipment: codes IP and IK

Share