ElectroMagnetic Compatibility (EMC): Difference between revisions
From Electrical Installation Guide
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
__NOTOC__ __NOEDITSECTION__ | __NOTOC__ __NOEDITSECTION__ | ||
== <br>[[Electrical distribution|Electrical distribution]] == | === <br>[[Electrical distribution|Electrical distribution]] === | ||
== [[Earthing principles and structures|Earthing principles and structures]] == | === [[Earthing principles and structures|Earthing principles and structures]] === | ||
== [[Implementation|Implementation]] == | === [[Implementation|Implementation]] === | ||
Equipotential bonding inside and outside buildings | |||
Improving equipotential conditions | |||
Separating cables | |||
False floor | |||
Cable running | |||
Busway | |||
Implementation of shielded cables | |||
Communication networks | |||
Implementation of surge arrestors | |||
Cabinet cabling | |||
Standards | |||
== [[Coupling mechanisms and counter-measures|Coupling mechanisms and counter-measures]] == | === [[Coupling mechanisms and counter-measures|Coupling mechanisms and counter-measures]] === | ||
General | |||
Common-mode impedance coupling | |||
Capacitive coupling | |||
Inductive coupling | |||
Radiated coupling | |||
== [[Wiring recommendations|Wiring recommendations]] == | === [[Wiring recommendations|Wiring recommendations]] === | ||
Signal classes | |||
Wiring recommendations |
Revision as of 17:39, 8 March 2010
Electrical distribution
Earthing principles and structures
Implementation
Equipotential bonding inside and outside buildings
Improving equipotential conditions
Separating cables
False floor
Cable running
Busway
Implementation of shielded cables
Communication networks
Implementation of surge arrestors
Cabinet cabling
Standards
Coupling mechanisms and counter-measures
General
Common-mode impedance coupling
Capacitive coupling
Inductive coupling
Radiated coupling
Wiring recommendations
Signal classes
Wiring recommendations