On-site work time: Difference between revisions
From Electrical Installation Guide
(Created page with '{{Menu_MV_&_LV_architecture_selection_guide}} <br> Time for implementing the electrical equipment on the site. ===== Different levels of priority ===== *Secondary: the on-sit…') |
m (r2.7.2) (robot Adding: ru:Длительность монтажа) |
||
Line 8: | Line 8: | ||
*Special: the on-site work time must be minimized, without generating any significant excess cost, | *Special: the on-site work time must be minimized, without generating any significant excess cost, | ||
*Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,<br> | *Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,<br> | ||
[[ru:Длительность монтажа]] |
Revision as of 14:14, 14 September 2012
Time for implementing the electrical equipment on the site.
Different levels of priority
- Secondary: the on-site work time can be extended, if this gives a reduction in overall installation costs,
- Special: the on-site work time must be minimized, without generating any significant excess cost,
- Critical: the on-site work time must be reduced as far as possible, imperatively, even if this generates a higher total installation cost,