Architecture assessment criteria: Difference between revisions

From Electrical Installation Guide
Home > MV and LV architecture selection guide for buildings > Architecture assessment criteria
(created this manual TOC page with introductory text)
 
(cleaned up source: table format, etc ...)
Line 1: Line 1:
{{Menu_MV_&_LV_architecture_selection_guide}}
{{Menu_MV_and_LV_architecture_selection_guide}}
Certain decisive criteria are assessed at the end of the 3 stages in defining architecture, in order to validate the architecture choice. These criteria are listed below with the different allocated levels of priority.
Certain decisive criteria are assessed at the end of the 3 stages in defining architecture, in order to validate the architecture choice. These criteria are listed below with the different allocated levels of priority.




{| cellpadding="1" style="border: 1px solid #8888aa; background: #f7f8ff; padding: 5px; "
{{Manual_TOC |
|
'''Contents:'''
* [[On-site work time]]
* [[On-site work time]]
* [[Environmental impact]]
* [[Environmental impact]]
* [[Preventive maintenance level]]
* [[Preventive maintenance level]]
* [[Availability of electrical power supply]]
* [[Availability of electrical power supply]]
|}
}}

Revision as of 13:10, 15 November 2013

Certain decisive criteria are assessed at the end of the 3 stages in defining architecture, in order to validate the architecture choice. These criteria are listed below with the different allocated levels of priority.


Share