Configuration of LV circuits: Difference between revisions

From Electrical Installation Guide
(Text updated (guide 2015))
(Text updated (guide 2015))
Line 6: Line 6:


[[File:FigD18.jpg|none]]
[[File:FigD18.jpg|none]]
'''Fig. D20:''' Single feeder configuration  
'''''Fig. D20:''''' ''Single feeder configuration''


* '''Parallel transformers configuration (fig.D21):''' The power supply is provided by more than 1 transformer generally connected in parallel to the same main LV switchboard.
* '''Parallel transformers configuration (fig.D21):''' The power supply is provided by more than 1 transformer generally connected in parallel to the same main LV switchboard.


[[File:FigD19.jpg|none]]
[[File:FigD19.jpg|none]]
'''Fig. D21:''' Parallel transformers configuration  
'''''Fig. D21:''''' ''Parallel transformers configuration''


* '''Variant: Normally open coupled transformers (fig.D22):''' In order to increase the availability it is possible to split the main LV switchboard into 2 parts, with a normally open bus-coupler (NO). This configuration may require an Automatic Transfer Switch between the coupler and transformer incomers.
* '''Variant: Normally open coupled transformers (fig.D22):''' In order to increase the availability it is possible to split the main LV switchboard into 2 parts, with a normally open bus-coupler (NO). This configuration may require an Automatic Transfer Switch between the coupler and transformer incomers.


[[File:FigD20.jpg|none]]
[[File:FigD20.jpg|none]]
'''Fig. D22:''' Normally open coupled transformers
'''''Fig. D22:''''' ''Normally open coupled transformers''


* '''Main LV switchboard interconnected by a busway (fig D23):''' Transformers are physically distant, and operated in parallel. They are connected by a busway, the load can always be supplied in the case of failure of one of the sources. The redundancy can be:
* '''Main LV switchboard interconnected by a busway (fig D23):''' Transformers are physically distant, and operated in parallel. They are connected by a busway, the load can always be supplied in the case of failure of one of the sources. The redundancy can be:
Line 24: Line 24:


[[File:FigD21.jpg|none]]
[[File:FigD21.jpg|none]]
'''Fig. D23:''' Main LV switchboard interconnected by a busway
'''''Fig. D23:''''' ''Main LV switchboard interconnected by a busway''


* '''LV ring configuration (fig. D24):''' This configuration can be considered as an extension of the previous configuration with interconnection between switchboards. Typically, 4 transformers connected in parallel to the same MV line, supply a ring using busway. A given load is then supplied by several transformers. This configuration is well suited to large sites, with high load density (in kVA/m²). If all of the loads can be supplied by 3 transformers, there is total redundancy in the case of failure of one of the transformers. In fact, each busbar can be fed by one or other of its ends. Otherwise, downgraded operation must be considered (with partial load shedding). This configuration requires special design of the protection plan in order to ensure discrimination in all of the fault circumstances.
* '''LV ring configuration (fig. D24):''' This configuration can be considered as an extension of the previous configuration with interconnection between switchboards. Typically, 4 transformers connected in parallel to the same MV line, supply a ring using busway. A given load is then supplied by several transformers. This configuration is well suited to large sites, with high load density (in kVA/m²). If all of the loads can be supplied by 3 transformers, there is total redundancy in the case of failure of one of the transformers. In fact, each busbar can be fed by one or other of its ends. Otherwise, downgraded operation must be considered (with partial load shedding). This configuration requires special design of the protection plan in order to ensure discrimination in all of the fault circumstances.
Line 31: Line 31:




'''Fig. D24:''' Ring configuration
'''''Fig. D24:''''' ''Ring configuration''


* '''Double-ended power supply (fig. D25):''' This configuration is implemented in cases where maximum availability is required. The principle involves having 2 independent power sources, e.g.:
* '''Double-ended power supply (fig. D25):''' This configuration is implemented in cases where maximum availability is required. The principle involves having 2 independent power sources, e.g.:
Line 42: Line 42:


[[File:FigD22.jpg|none]]
[[File:FigD22.jpg|none]]
'''Fig. D25:''' Double-ended configuration with automatic transfer switch
'''''Fig. D25:''''' ''Double-ended configuration with automatic transfer switch''


* '''Configuration combinations (fig D.26):''' An installation can be made up of several sub-asssemblies with different configurations, according to requirements for the availability of the different types of load. E.g.: generator unit and UPS, choice by sectors (some sectors supplied by cables and others by busways).
* '''Configuration combinations (fig D.26):''' An installation can be made up of several sub-asssemblies with different configurations, according to requirements for the availability of the different types of load. E.g.: generator unit and UPS, choice by sectors (some sectors supplied by cables and others by busways).


[[File:FigD23.jpg|none]]
[[File:FigD23.jpg|none]]
'''Fig. D26:''' Example of a configuration combination
'''''Fig. D26:''''' ''Example of a configuration combination''


1: Single feeder, 2: Main LV switchboard interconnected by a busway, 3: Double-ended
1: Single feeder, 2: Main LV switchboard interconnected by a busway, 3: Double-ended
Line 108: Line 108:
|}
|}


'''Fig. D27:''' Recommendations for the configuration of LV circuits
'''''Fig. D27:''''' ''Recommendations for the configuration of LV circuits''


[[ru:Конфигурация цепей низкого напряжения]]
[[ru:Конфигурация цепей низкого напряжения]]
[[zh:低压回路的配置]]
[[zh:低压回路的配置]]

Revision as of 10:32, 8 December 2014


Main possible configurations:

  • Single feeder configuration (fig.D20): This is the reference configuration and the most simple. A load is connected to one single source. This configuration provides a minimum level of availability, since there is no redundancy in case of power source failure.
FigD18.jpg

Fig. D20: Single feeder configuration

  • Parallel transformers configuration (fig.D21): The power supply is provided by more than 1 transformer generally connected in parallel to the same main LV switchboard.
FigD19.jpg

Fig. D21: Parallel transformers configuration

  • Variant: Normally open coupled transformers (fig.D22): In order to increase the availability it is possible to split the main LV switchboard into 2 parts, with a normally open bus-coupler (NO). This configuration may require an Automatic Transfer Switch between the coupler and transformer incomers.
FigD20.jpg

Fig. D22: Normally open coupled transformers

  • Main LV switchboard interconnected by a busway (fig D23): Transformers are physically distant, and operated in parallel. They are connected by a busway, the load can always be supplied in the case of failure of one of the sources. The redundancy can be:

- Total: each transformer being able to supply all of the installation,
- Partial: each transformer only being able to supply part of the installation. In this case, part of the loads must be disconnected (load-shedding) in the case of one of transformer failure.

FigD21.jpg

Fig. D23: Main LV switchboard interconnected by a busway

  • LV ring configuration (fig. D24): This configuration can be considered as an extension of the previous configuration with interconnection between switchboards. Typically, 4 transformers connected in parallel to the same MV line, supply a ring using busway. A given load is then supplied by several transformers. This configuration is well suited to large sites, with high load density (in kVA/m²). If all of the loads can be supplied by 3 transformers, there is total redundancy in the case of failure of one of the transformers. In fact, each busbar can be fed by one or other of its ends. Otherwise, downgraded operation must be considered (with partial load shedding). This configuration requires special design of the protection plan in order to ensure discrimination in all of the fault circumstances.

As the previous configuration this type of installation is commonly used in automotive industry or large site manufacturing industry.


Fig. D24: Ring configuration

  • Double-ended power supply (fig. D25): This configuration is implemented in cases where maximum availability is required. The principle involves having 2 independent power sources, e.g.:

- 2 transformers supplied by different MV lines,
- 1 transformer and 1 generator,
- 1 transformer and 1 UPS.

An automatic transfer switch (ATS) is used to avoid the sources being parallel connected. This configuration allows preventive and curative maintenance to be carried out on all of the electrical distribution system upstream without interrupting the power supply.

FigD22.jpg

Fig. D25: Double-ended configuration with automatic transfer switch

  • Configuration combinations (fig D.26): An installation can be made up of several sub-asssemblies with different configurations, according to requirements for the availability of the different types of load. E.g.: generator unit and UPS, choice by sectors (some sectors supplied by cables and others by busways).
FigD23.jpg

Fig. D26: Example of a configuration combination

1: Single feeder, 2: Main LV switchboard interconnected by a busway, 3: Double-ended

For the different possible configurations, the most probable and usual set of characteristics is given in the following table:

Characteristic to be considered Configuration
 Single feeder (fig. D20)  Parallel transformer or transformers connected via a coupler (fig. D21-D22) Main LV switchboard interconnected by a busway (fig D24)  LV ring Double-ended
Site topology Any Any 1 level 5000 to 25000 m² 1 level 5000 to 25000 m² Any
Power demand < 2500kVA Any ≥ 2500kVA > 2500kVA Any
Location latitude Any Any Medium or high Medium or high Any
Load distribution Localized loads Localized loads Intermediate or uniform load distribution Intermediate or uniform load distribution Localized loads
Maintainability Minimal Standard Standard Standard Enhanced
Disturbances sensitivity Low sensitivity High sensitivity High sensitivity High sensitivity High sensitivity

Fig. D27: Recommendations for the configuration of LV circuits