Choice of architecture fundamentals: Difference between revisions

From Electrical Installation Guide
Home > MV and LV architecture selection guide for buildings > Choice of architecture fundamentals
m (1 revision: no page modification, previous revision = imported ch.D pages cleaned-up)
(Cleanup_2016)
Line 9: Line 9:
***The definition of the MV back-up generator when needed.
***The definition of the MV back-up generator when needed.
* The second stage deals with the principle of supply of the LV consumers  
* The second stage deals with the principle of supply of the LV consumers  


{{Manual_TOC |
{{Manual_TOC |

Revision as of 00:58, 21 November 2016


For the installations considered in this guide, the selection of an electrical architecture can be performed in two stages.

  • The first stage is generally dedicated to:
    • The selection of the mode of connection of the installation to the utility network,
    • The choice of the internal MV distribution including:
      • The definition of the number of MV/LV substations,
      • The definition of the number of MV/LV transformers,
      • The definition of the MV back-up generator when needed.
  • The second stage deals with the principle of supply of the LV consumers

ru:Выбор основных элементов архитектуры zh:系统基本条件的选择

Share