Main characteristics to consider to determine the number of transformers:

  • Surface of building or site
  • Total power of the installed loads
  • Sensitivity of circuits to power interruptions
  • Sensitivity of circuits to disturbances
  • Installation scalability

The basic preferred configuration comprises a single transformer supplying the total power of the installed loads. Certain factors contribute to increasing the number of transformers (> 1), preferably of equal power:

  • A high total installed power (> 1250kVA): practical limit of unit power (standardization, ease of replacement, space requirement, etc),
  • A large surface area (> 5000m²): the setting up of several transformers as close as possible to the distributed loads allows the length of LV trunking to be reduced
  • A need for partial redundancy (down-graded operation possible in the case of a transformer failure) or total redundancy (normal operation ensured in the case a transformer failure)
  • Separating of sensitive and disturbing loads (e.g.: IT, motors)