Overhead networks

Weather conditions such as wind may bring overhead wires into contact and cause phase to phase short-circuits.

Over voltages due to lightning strokes may generate flash-over across ceramic or glass insulators and cause phase to earth faults

Temporary contacts of vegetation such as trees with live overhead conductors may also generate phase to earth faults.

Most of these faults are temporary. They disappear naturally with the interruption of the voltage. This means that the supply can be restored after a short delay following the tripping. This delay is usually named "dead time".

Hence the sequence of fault clearing and voltage restoration in an overhead network is as follow:

  • Fault detection by phase to phase or phase to earth protection
  • Circuit breaker opening, the faulty over-head line is de-energized
  • Dead time
  • Circuit breaker reclosing. Following the reclosing two situations are possible:

- The fault has been cleared by the interruption of the voltage, the reclosing is successful

- The line is still faulty, a new tripping is initiated followed again by a reclosing sequence.

  • Several sequences of tripping-reclosing may be activated depending on the rules of operation of the network adopted by the utility
  • If after the execution of the preselected number of reclosing sequences the fault is still present, the circuit breaker is automatically locked and consequently the faulty part of the network remains out of service until the fault is localized and eliminated.

As such, it is possible to improve significantly the service continuity of overhead networks by using automatic reclosing facilities. Generally a reclosing circuit breaker is associated to each overhead line.

Underground networks

Cable Faults on underground MV cables may have several causes such as:

  • Poor quality of cable laying, absence of mechanical protection
  • Bad quality of cable terminations confection
  • Damages caused by excavators or tools such as pneumatic drills
  • Over voltages generated by lightning strokes occurring on overhead line connected to underground cables. The over voltages can be amplified at the levels of the junctions between overhead lines and underground cables causing the destruction of the cable terminations. Lightning arresters, are often installed at these locations to limit the risks of damages.

The experience shows that the rate of fault occurring on underground cables is lower than the one registered for overhead lines. But faults on underground cables are invariably permanent and take longer time to locate and repair.

A loop architecture (see Fig. B10) correctly instrumented with fault detectors and motorized load break switches allow within a short period of time to identify a faulty cable, to disconnect it and to restore the supply to the whole substations included in the loop.

These procedures of faults detection, cables disconnection and supply restoration can be automatically performed in less one minute by dedicated functions commonly integrated in remote control and monitoring systems of MV networks.

Remote control and monitoring for MV network

The use of centralised remote control and monitoring based on SCADA (Supervisory Control And Data Acquisition) systems and recent developments in digital communication technology is increasingly common in countries where the complexity associated with highly interconnected networks justifies the investment required.

Remote control and monitoring of MV feeders makes it possible to reduce loss of supply resulting from cable faults by supporting fast and effective loop reconfiguration.

This facility relies on motorized switches associated with fault detectors on a number of substations in the loop and controlled by remote control units. All stations containing this equipment can have their supply restored remotely, whereas other stations will require additional manual operations.


Fig. B7: Supervisory Control And Data Acquisition System SCADA

Values of earth fault currents in MV networks

(see Fig. B8 and Fig. B9)

The values of earth fault currents in MV distribution networks depend on the MV neutral earthing system. These values must be limited to reduce their effects, mainly:

  • Damages to equipment
  • Temporary over voltages
  • Transient over voltages
  • Touch and step voltages.

The neutral of an MV network can be earthed by five different methods, according to type (resistive, inductive) and the value (zero to infinity) of the impedance Zn connected between the neutral and the earth:

  • Zn = ∞ isolated neutral, no intentional neutral earthing connection
  • Zn is related to a resistance with a fairly high value,
  • Zn is related to a reactance, with a generally low value,
  • Zn is related to a compensation reactance, designed to compensate the capacitance of the network
  • Zn = 0: the neutral is solidly earthed.
Methods of Neutral Earthing
Isolated Resistance Reactance Compensated Solid
Damages Very low Low Low Very low Very high
Temporary over voltages High Medium Medium Medium Low
Transient over voltages High Low High High Low
Touch and step voltages Very low Low Low Low High

Fig. B8: Effects of the phase to earth fault current


Fig. B9: Circulation of the phase to earth fault current

The fault current IK1 is the sum of two components:

  • The neutral current through the impedance Zn
  • The capacitive current through the phase to earth capacitors.

When Zn is a reactance these two currents are opposite, which means that the reactance compensate the capacitive current. If the compensation is perfect, the fault current value is zero.