Example: electrical installation in a printworks
Brief description
Printing of personalized mailshots intended for mail order sales.
Installation characteristics
Characteristic | Category |
---|---|
Activity | Mechanical |
Site topology | single storey building, 10000m² (8000m² dedicated to the process, 2000m² for ancillary areas) |
Layout latitude | High |
Service reliability | Standard |
Maintainability | Standard |
Installation flexibility |
- finishing, putting in envelopes |
Power demand | 3500kVA |
Load distribution | Intermediate distribution |
Power interruptions sensitivity |
- offices (apart from PC power sockets)
- printing machines
- servers, office PCs |
Disturbance sensitivity |
No special precaution to be taken due to the connection to the EdF network |
Disturbance capability | Non disturbing |
Other constraints |
|
Technological characteristics
Criteria | Category |
---|---|
Atmosphere, environment |
|
Service index | 211 |
Offer availability by country | No problem (project carried out in France) |
Other criteria | Nothing particular |
Architecture assessment criteria
Criteria | Category |
---|---|
On-site work time | Secondary |
Environmental impact | Minimal: compliance with European standard regulations |
Preventive maintenance costs | Standard |
Power supply availability | Level I |
Step 1: Architecture fundamentals
Choice | Main criteria | Solution |
---|---|---|
Connection to network | Isolated site | single branch circuit |
MV Circuits | Layout + criticality | single feeder |
Number of transformers | Power > 2500kVA | 2 x 2000kVA |
Number and distribution of substations |
Surface area and power distribution |
2 possible solutions: 1 substation or 2 substations
|
MV Generator | Site activity | No |
Fig. D29: Two possible single-line diagrams
Step 2: Architecture details
“1 substation” solution
Choice | Main criteria | Solution |
---|---|---|
Layout | Atmospheric constraint | Dedicated premises |
Centralized or decentralized layout |
Uniform loads, distributed power, scalability possibilities Non-uniform loads, direct link from MLVS |
- finishing sector, envelope filling
- special machines, rotary machines, HVAC, process |
Presence of back-up generator |
Criticality ≤ low Network availability: standard |
No back-up generator |
Presence of UPS | Criticality | UPS unit for servers and office PCs |
LV circuit configuration | 2 transformers, possible partial redundancy |
|
Fig. D30: Detailed single-line diagram (1 substation)
Choice of technological solutions:
Choice | Main criteria | Solution |
---|---|---|
MV/LV substation | Atmosphere, environment | indoor (dedicated premises) |
MV switchboard | Offer availability by country | SM6 (installation produced in France) |
Transformers | Atmosphere, environment | cast resin transfo (avoids constraints related to oil) |
LV switchboard | Atmosphere, IS | MLVS: Prisma + P Sub-distribution: Prisma + |
Busbar trunking | Installed power to be supplied | Canalis KS |
UPS units | Installed power to be supplied, back- up time | Galaxy PW |
Power factor correction | Installed power, presence of harmonics | LV, standard, automatic (Average Q, ease of installation) |
“2 substation” solution
Ditto apart from:
LV circuit: 2 remote MLVS connected via busbar trunking
Fig. D31: Detailed single-line diagram (2 substations)